Skip to main content

Pole mounted safety solution minimises vehicle damage, injuries

The product consists of a metal box installed under urban equipment, such as streetlamps, pillars, and signposts. In the event of an impact from a vehicle, the equipment will release very easily so damage to the bodywork will be minimised, as will injuries and human losses.
February 26, 2014 Read time: 1 min
The 7619 Sistemas Palazón Safety Mounting consists of a metal box installed under urban equipment, such as streetlamps, pillars, and signposts. In the event of an impact from a vehicle, the equipment will release very easily so damage to the bodywork will be minimised, as will injuries and human losses.
%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 4 93285 0 oLinkExternal www.SistemasPalazon.com Sistemas Palaz&amp;#243;n web false /EasySiteWeb/GatewayLink.aspx?alId=93285 false false%>

For more information on companies in this article

Related Content

  • Falling asleep in an AV… but what happens next?
    September 18, 2019
    Sleeping while a driverless car speeds you to your destination has long been touted as the dream of the new technology – and something of a nightmare for safety campaigners. A new video from the BBC shows exactly what happens if a driver falls asleep in an autonomous vehicle (AV). In the filmed test, the AV prompts the driver to resume control when approaching roadworks on a motorway. When the driver fails to act, the vehicle comes to a halt and automatically parks in a lay-by. Motor industry research
  • Fluor to upgrade Red and Purple rail lines in Chicago
    December 20, 2018
    A joint venture team of Fluor and Walsh Construction has been chosen as the preferred partner for phase one of the Red and Purple Line modernisation programme in Chicago. The Chicago Transit Authority is behind the $2.1 billion project, which is expected to improve infrastructure across both lines. The scope of the contract includes the development of new elevated tracks along a 1.9-mile section – featuring new bridges, support structures and existing tracks. Also, 3.2 miles of the signal system will be
  • MKM Mobilitas installs Tritium fast charger in Budapest
    November 20, 2018
    NKM Mobilitas has installed a Tritium liquid-cooled DC fast charger for electric vehicles (EV) at the Koki Terminál P+R, a parking facility in Budapest. NKM Mobilitas is a subsidiary of National Utilities, the state Hungarian provider which supplies gas and electricity to households in the country. Tritium’s Veefil-RT 50kW DC fast charger is expected to provide NKM Mobilitas’ customers with 125km of range in 30 minutes. The solution offers Chademo and CCS connectors as well as an interface and inte
  • BM Mobility launches electric bike-sharing service in Malaysia
    August 14, 2018
    BM Mobility has launched its Revgo electric bike-sharing service at the University of Malaya in Malaysia to provide an environmentally friendly mode of transport. A report by The Straits Times says the company will deploy 170 bikes which can travel up to 20km an hour and reach 50km on a full charge. RevGo bikes were initially deployed at the University in July, which according to BM Mobility, now has around 1,000 registered members. The campus has eight parking sites and two charging stations which can