Skip to main content

ParkCAD 4.0

ParkCAD 4.0 is the latest version of Transoft Solution's CAD parking site design software. It includes new features that make designing parking lots a much more refined process, with support of arcs in the creation of perimeter rows and drive aisles.
February 6, 2012 Read time: 1 min
ParkCAD 4.0 is the latest version of 2187 Transoft Solution's CAD parking site design software. It includes new features that make designing parking lots a much more refined process, with support of arcs in the creation of perimeter rows and drive aisles. The software now lets users run different combinations of row positions and rotations, yielding the maximum number of parking spaces in a boundary. The new design manager functionality also allows multiple iterations of parking layouts to be saved, updated, recalled and then compared for client proposals and parking studies.

For more information on companies in this article

Related Content

  • Iteris receives $9.5m three-year ARC-IT deal with USDoT
    November 3, 2023
    Task order continues company's long-running advisory role on ARC-IT framework
  • Case Systems call boxes and parking system
    April 15, 2013
    Case Systems, which develops and maintains innovative reliable wireless technologies for the transportation and parking industries, will use the ITS America Annual Meeting to highlight its roadside call box technology and parking systems.
  • Axis aids incident detection on French viaduct
    October 31, 2016
    France’s first AID system has halved attendance time on the Calix Viaduct. TheCentre for Traffic Engineering and Management (CIGT) at Caen in northern France manages 367km of the national network in the Manche/Calvados district including the 1.2km long, 15-span Calix Viaduct across the Canal de Caen à la Mer.
  • New thinking needed on the transportation front
    December 10, 2014
    Having spent his working life in transportation, Larry Yermack gives his views on today’s technology challenges. I remember it vividly; it was the late 80s, soon after I started as CFO of the Triborough Bridge and Tunnel Authority and I was standing mid-span on the deck of the Verrazano Narrows Bridge on a Friday afternoon.