Skip to main content

Lindsay Road Zipper deployed for Austria tunnel project

Lindsay Transportation Solutions is using Intertraffic to highlight a current, major deployment of its Road Zipper System in Austria.
April 6, 2016 Read time: 2 mins
Chris Sanders of Lindsay Transportation Solutions
7613 Lindsay Transportation Solutions is using Intertraffic to highlight a current, major deployment of its Road Zipper System in Austria.


Work is underway in Vienna to rehabilitate two aging tunnels and the asphalt highway sections that connect them. Tunnels, like bridges, offer additional challenges for road works. Typically, there is very little additional space, and the work zone must be created from active traffic lanes.

The Vienna work zone runs for 3km in the southbound direction of the A23 and it includes structural repairs to the Hirschstetten Tunnel and the Stadlau Tunnel.  The Hirschstetten Tunnel at the north end of the work zone is two lanes per tunnel direction, and the Stadlau Tunnel to the south provides three lanes in each direction.

“As a major thoroughfare in and out of Vienna, the A23 would suffer massive traffic queues if all lanes were not available for the peak traffic commute,” Paul Grant of Lindsay Transportation Solutions explains.

“To create a work zone where lanes could be quickly opened and closed while still providing positive barrier separation between workers and motorists, ASFiNAG, the  Austrian publicly owned corporation which plans, finances, builds, maintains and collects tolls for the Austrian autobahns, chose our Road Zipper System.

“The barrier wall sections were brought from Holland and installed over a three-night period by Marjo Salari Transport. The Barrier Transfer Machine, or BTM, was imported by Alpina and is operated on a nightly basis by subcontractor Sitec.”

Each night, the barrier wall is moved out and the work zone is expanded to make room for larger, more efficient equipment than would be possible without the extra work zone space. Construction crews work efficiently knowing that they are protected from vehicle encroachments into the work zone by the concrete barrier.

The Austria tunnels project is the most recent European road works to use the Road Zipper System, which has been used successfully for road works in Italy, Holland and the UK.

For more information on companies in this article

Related Content

  • Key Russian PPP project
    April 18, 2012
    The Northern Capital Highway (NCH) consortium has been named the preferred bidder in the tender for the central section of St Petersburg’s Western High-Speed Diameter (WHSD) project. Should NCH win the tender process it will build and then operate the entire stretch of the toll road. The consortium comprises VTB Capital and Gazprombank from Russia in partnership with Italian company Astaldi and Turkish firm Ictas Insaat.
  • Cost benefit: Toronto retimings tame traffic trauma
    July 19, 2018
    Canada’s largest city reckons that it is saving its taxpayers’ money simply by altering the way traffic lights work. David Crawford reviews Toronto’s ambitious plans to ease congestion Toronto, Canada’s largest metropolis (and the fourth largest in North America), has saved its residents CAN$53 (US$42.4) for every CAN$1 (US$0.80) spent over a 2012-2016 traffic signal retiming programme, according to figures released by its Transportation Services Division. The programme covered 1,275 signals (the city’s
  • Axis aids incident detection on French viaduct
    October 31, 2016
    France’s first AID system has halved attendance time on the Calix Viaduct. TheCentre for Traffic Engineering and Management (CIGT) at Caen in northern France manages 367km of the national network in the Manche/Calvados district including the 1.2km long, 15-span Calix Viaduct across the Canal de Caen à la Mer.
  • New system expedites border crossings
    October 28, 2016
    Enforcing border controls can create long queues for travellers, David Crawford looks at potential solutions. Long delays at border crossings in both North America and Europe have sparked the development of new queue visualisation and management technologies that are cutting hours, even days, off international passenger and freight journeys. At the westernmost end of the 2,019km (1,250 mile) Mexico–US frontier, two parallel crossings between Tijuana, in the former country, and the border city of San Diego,