Skip to main content

Jiffy Splices repair damaged electrical connections

TE Connectivity’s Deutsch Jiffy Splices are a field-serviceable alternative to permanent splices, designed to withstand the harsh conditions of the construction, mining, marine and agricultural industries.
November 4, 2016 Read time: 1 min

3826 TE Connectivity’s Deutsch Jiffy Splices are a field-serviceable alternative to permanent splices, designed to withstand the harsh conditions of the construction, mining, marine and agricultural industries. They are said to be easy to install and can be used to quickly repair damaged electrical connections on equipment at the job site.

Jiffy Splices protect connections from dirt, dust, and water immersion up to three feet. They are made from the same high-quality silicone elastomer as TE’s Deutsch industrial connector seals and grommets. They house a contact retention system that secures a mated pair of contacts in a compact environmentally sealed unit.

Jiffy Splices are available in two sizes and accept one Deutsch pin and socket. Their contacts are easily removed for servicing using standard Deutsch removal tools.

For more information on companies in this article

Related Content

  • New Prosilica GT camera range
    January 31, 2012
    Allied Vision Technologies (AVT) has launched Prosilica GT, a new range of GigE Vision compliant digital cameras designed to perform in extreme environments and fluctuating lighting conditions. The company says the range offers new advanced features well suited for outdoor installations such as ITS and traffic monitoring, public security and surveillance. Designed to minimise field maintenance by surviving extreme weather events, the Prosilica GT features a rugged thermal housing for maximum heat dissipat
  • Milesight officially launches 4G Solar-powered camera series
    October 1, 2024
    Product is designed to solve challenges of deploying network cameras in off-grid areas
  • Moxa provides clear vision for Caldecott Tunnel’s Fourth Bore
    September 15, 2014
    Caldecott Tunnel’s new Fourth Bore is utilising a bespoke high-capacity monitoring and communications network from Moxa. The Caldecott Tunnel connects Contra Costa and Alameda counties in Northern California and traditionally it has suffered severe congestion - especially during peak hours. Opened in 1937 as a twin-bore arrangement, by 1964 the increase in traffic volumes led to a third bore being added. Shortly after the third bore was opened a tidal flow was introduced with the centre bore alternating in
  • LED emergency floodlight
    January 27, 2012
    A new floodlight combining maintenance-free LED technology and a self-contained backup battery has been introduced by hazardous area lighting specialist Chalmit Lighting. The Solas is designed for use in both Zone 1 hazardous areas and harsh marine environments.