Skip to main content

Jiffy Splices repair damaged electrical connections

TE Connectivity’s Deutsch Jiffy Splices are a field-serviceable alternative to permanent splices, designed to withstand the harsh conditions of the construction, mining, marine and agricultural industries.
November 4, 2016 Read time: 1 min

3826 TE Connectivity’s Deutsch Jiffy Splices are a field-serviceable alternative to permanent splices, designed to withstand the harsh conditions of the construction, mining, marine and agricultural industries. They are said to be easy to install and can be used to quickly repair damaged electrical connections on equipment at the job site.

Jiffy Splices protect connections from dirt, dust, and water immersion up to three feet. They are made from the same high-quality silicone elastomer as TE’s Deutsch industrial connector seals and grommets. They house a contact retention system that secures a mated pair of contacts in a compact environmentally sealed unit.

Jiffy Splices are available in two sizes and accept one Deutsch pin and socket. Their contacts are easily removed for servicing using standard Deutsch removal tools.

For more information on companies in this article

Related Content

  • UK shopping centre opts for APT parking systems
    August 28, 2015
    APT Skidata is to deliver a fully integrated parking solution for the Bradford Broadway shopping centre development – the UK’s largest retail centre to be opened in 2015. Currently in its final construction phase, the shopping centre, situated in the heart of Bradford’s retail district, is part of a wider urban regeneration project in Bradford, ‘Connecting the City’, and is due to open on 5 November.
  • Wider uses for weigh in motion data
    March 18, 2014
    Colin Sowman talks to Terry Bergan of International Road Dynamics about the latest uses of weigh-in-motion systems. Raising allowable truck weight limits improve transport efficiency but leaves an ever-increasing number of bridges vulnerable to being overloaded and damaged by vehicles heavier, and in some cases far heavier, than they were designed to carry. The simplistic solution is to impose weight restrictions and erect appropriate signs - but this could have severe knock-on effect on trucking operations
  • Colombian highway sees ITS tested to the extreme
    November 13, 2014
    One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio. Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory.
  • Innovating with the O-Ring: Boosting efficiency in road stud maintenance
    December 10, 2024
    SR-45C and SR-48C offer durability without compromising performance