Skip to main content

EVgo adds second-life batteries to charging system

EVgo has added second-life BMW i3 batteries to its Union City fast-charging station in California to help store energy during peak solar hours and reduce strain on the grid. This energy is then used to deliver a fast charge to EVgo customers’ electric vehicles during periods of high demand. The second-life battery system integrates two BMW i3 battery packs into a single housing. Evgo says each battery pack has a capacity of 22kWh which combines with a 30kW inverter to offer a 30kW/44kWh energy storage
October 15, 2018 Read time: 1 min

8881 EVgo has added second-life BMW i3 batteries to its Union City fast-charging station in California to help store energy during peak solar hours and reduce strain on the grid. This energy is then used to deliver a fast charge to EVgo customers’ electric vehicles during periods of high demand.

The second-life battery system integrates two BMW i3 battery packs into a single housing.

Evgo says each battery pack has a capacity of 22kWh which combines with a 30kW inverter to offer a 30kW/44kWh energy storage system.

Princeton Power Systems provided the inverter hardware and integrated it with the battery packs. Meanwhile, technology company Kisensum developed software controls for the battery system and managed software integration.

The EVgo Union City site began operating earlier this summer and currently has two 50kW DC fast chargers.

For more information on companies in this article

Related Content

  • New UPS to protect Siemens traffic control systems
    November 12, 2014
    Siemens has teamed up with uninterruptible power supply (UPS) specialist, Harland Simon UPS, which has created a new range of UPS systems for Siemens the company to offer critical protection within key traffic control systems, reducing the chances of accidents and traffic congestion in the event of power failure. The high specification solution is based on the Harland ProtectUPS-T, which can be adapted to meet specific demands that are available in 500W, 1000W and 2000W versions. The system is equipped w
  • Go wireless with Traffic Group
    December 2, 2021
    Wireless temporary traffic light system - Metro Haul Route Crossing System - launched
  • Charge to expand e-scooter support in Paris
    February 25, 2021
    Docking stations will be rolled out in 100 locations over 18 months in Paris
  • Mounting benefits of dynamic tolling project
    January 30, 2012
    Wisconsin's four-year HOT lanes pilot project, launched in May 2008, cost US$18.8 million to construct. Halfway into the project, which uses variably priced, or dynamic, tolling to improve highway efficiency, the benefits are mounting. The problem was obvious, and frustrating, to anyone who ever sat in bumper-to-bumper traffic on State Route 167 and watched a lone car whiz by every 20 seconds or so in the carpool lane. But for planners at the Washington State Department of Transportation, the conundrum was