Skip to main content

ChargeWheel sparks mobile EV charging in San Francisco

ChargeWheel has secured $1 million in funding to launch a mobile electric vehicle (EV) charging network in the San Francisco Bay Area. The network will be based on ChargeWheel’s mobile Energy Trailers, which don’t require a connection to the grid, and can therefore operate in any car park. The company says they offer a combined solar-powered generation and energy storage solution, and plans to deploy 100 in the Bay Area by the end of 2019. The units can simultaneously charge four EVs or up to 400 elec
August 16, 2019 Read time: 2 mins
ChargeWheel has secured $1 million in funding to launch a mobile electric vehicle (EV) charging network in the San Francisco Bay Area.


The network will be based on ChargeWheel’s mobile Energy Trailers, which don’t require a connection to the grid, and can therefore operate in any car park.

The company says they offer a combined solar-powered generation and energy storage solution, and plans to deploy 100 in the Bay Area by the end of 2019. The units can simultaneously charge four EVs or up to 400 electric bikes or e-scooters at DC fast-charging (DCFC) speeds.

Huzaifa Muhammad, CEO and founder of ChargeWheel, says micromobility charging networks and infrastructure do not exist where micromobility devices are primarily used.

“Many of the largest fleet operators are relying on warehouses far away from city centres, stocked with diesel generators to charge their vehicles en masse,” he continues. “Similarly, there is a lack of DC fast-chargers in large city centres for electric car drivers, mainly due to lengthy permitting and infrastructure installation issues.”

ChargeWheel’s Energy Trailers are equipped with solar panels, 550kWh of energy storage capacity. The company will introduce a $99 yearly unlimited charging subscription plan, allowing drivers to charge their vehicles at a fixed cost from any location.

The company says EV fleet operators will also benefit because they can lease the trailers on yearly contracts.

Related Content

  • Copenhagen to showcase ITS in action at ITSWC 2018
    December 18, 2017
    As delegates head for the 2017 ITS World Congress in Montreal, we talk to Copenhagen mayor Morten Kabell about why his city is the ideal location for next year’s event. It may have been a long time coming but the ITS World Congress will be in Copenhagen in 2018 and there can be few more fitting places to host the event. By any number of metrics - interconnected transport, cycle commuting, safer streets, reduced pollution, sustainable energy and quality of life - the Danish capital has implemented what m
  • UK government reveals £400m EV charging network boost
    September 13, 2018
    The UK government is providing £400m to create an electric vehicle (EV) charging point infrastructure, in partnership with the automotive industry. UK prime minister Theresa May says the government will ensure charge points can be easily accessed and available at motorway service stations and other petrol stations. There will also be £1.5bn for the development of ultra-low emission vehicles (ULEVS). Speaking at the country’s first Zero Emission Vehicle (ZEV) Summit in Birmingham, May unveiled an ‘am
  • Cost benefit analysis ‘can’t be carried out with a cookbook’
    June 25, 2018
    There is far more to working out the worth of a project than simply filling in a few headings on a spreadsheet. David Crawford surveys some recent thinking from the US and Canada. Cost benefit analysis (CBA) “can’t be carried out with a cookbook”, warns US analyst Professor Robert J Brent. “ You can’t just get out a spreadsheet and fill in the data for all the headings. Each transport CBA should have something that is distinctive, in terms of location (for example, for a rural area), types of user
  • EVgo installs EV fast-chargers at six locations in Los Angeles
    November 19, 2018
    EVgo has expanded its deployment of electric vehicle (EV) fast-chargers to six locations across Los Angeles in a bid to accelerate adoption of the technology. EVgo says the power ratings from its fast-chargers range from 50 kW to 350 kW and is convenient for drivers using their EV for ride-sharing and those without home or workplace charging. The chargers are located at the following locations: