Skip to main content

Bartco launches temporary VMS for work zones

UK manufacturer of temporary, solar powered variable message signs (VMS), Bartco UK, will unveil what it claims is the first temporary VMS designed for use within work zones. The HD Quattro was developed in response to feedback from customers requiring a product to affirm on-site speed limits for work zone vehicles. Designed to show limited amounts of information, such as speed roundels, at just 600mm x 600mm, the free-standing, 12v battery-powered device is the smallest VMS in Bartco’s portfolio.
February 8, 2016 Read time: 2 mins
Bartco, manufacturer of temporary, solar powered variable message signs

UK manufacturer of temporary, solar powered variable message signs (VMS), 8321 Bartco UK, will unveil what it claims is the first temporary VMS designed for use within work zones. The HD Quattro was developed in response to feedback from customers requiring a product to affirm on-site speed limits for work zone vehicles.

Designed to show limited amounts of information, such as speed roundels, at just 600mm x 600mm, the free-standing, 12v battery-powered device is the smallest VMS in Bartco’s portfolio.

Bartco is also launching what it believes may be the first two-colour VMS of its size to feature a 126 pixel x 84 pixel dual colour matrix. The 2,730mm x 1,850mm HD VMS-C offers higher resolution than standard VMS, and was developed to enable traffic management firms to clearly display - in high-impact red and white rather than standard amber - information regarding up to five lanes.

For more information on companies in this article

Related Content

  • High-res traffic data provides planners with the big picture
    November 5, 2015
    Road authorities have a lot to gain from high-resolution traffic data, argues Pravin Varaiya. Traffic engineers have traditionally been forced to operate with limited data regarding the performance of their arterials. Traffic studies are often commissioned once every three years, over a few days, to get an updated estimate of utilization.
  • Moxa provides clear vision for Caldecott Tunnel’s Fourth Bore
    September 15, 2014
    Caldecott Tunnel’s new Fourth Bore is utilising a bespoke high-capacity monitoring and communications network from Moxa. The Caldecott Tunnel connects Contra Costa and Alameda counties in Northern California and traditionally it has suffered severe congestion - especially during peak hours. Opened in 1937 as a twin-bore arrangement, by 1964 the increase in traffic volumes led to a third bore being added. Shortly after the third bore was opened a tidal flow was introduced with the centre bore alternating in
  • TfL launches app to aid social distancing
    August 25, 2020
    App provides accessibility information for disabled users, TfL says. 
  • Mahindra Reva Electric Vehicles plant inaugurated
    August 23, 2012
    Yesterday, Mahindra Reva Electric Vehicles, a part of the US$15.4 billion Mahindra Group, formally inaugurated its manufacturing facility, which is the first platinum rated automobile facility in India. Inaugurating the world-class, energy efficient, green manufacturing facility, Anand Mahindra, chairman and managing director, Mahindra Group unveiled the Group's vision to co-create and shape the "future of mobility".