Skip to main content

Advantech Ethernet switch gets ENK50121 approval for railway deployments

Advantech has said its new managed Ethernet switch has just passed EN50121 approval for railway trackside deployment. The switch can operate in a wide operating temperature from -40 to 75 degrees Celsius and includes high-speed recovery times for network stability. IXM provisioning technology is embedded within the switch, allowing auto-synchronisation of firmware updates and push configuration settings with installation. According to the company, the simple installation and upkeep saves traffic engineers t
June 7, 2018 Read time: 1 min
© F11photo | Dreamstime.com

548 Advantech has said its new managed Ethernet switch has just passed EN50121 approval for railway trackside deployment. The switch can operate in a wide operating temperature from -40 to 75 degrees Celsius and includes high-speed recovery times for network stability. IXM provisioning technology is embedded within the switch, allowing auto-synchronisation of firmware updates and push configuration settings with installation. According to the company, the simple installation and upkeep saves traffic engineers time and budget.

For more information on companies in this article

Related Content

  • Israel Railways deploys train planning system
    February 9, 2015
    Israel Railways is to use HaCon’s train planning system, TPS, for its train planning and capacity management, including all schedules and route inquiries for passenger and freight traffic. The rail operator aims to fully replace its legacy tools and systems with TPS by the end of the year. The contract also includes HAFAS components for timetable publishing. Israel Railways acts as both infrastructure manager and train operator, with 2,370 employees and a network of approximately 1,100 kilometres of tr
  • Kapsch CarrierCom to implement railway communication network in Luxembourg
    March 30, 2016
    Luxembourg’s national railway operator CFL has awarded Kapsch CarrierCom the contract to implement a countrywide railway communication network based on GSM-R (Global System for Mobile Communications – Railway) for the country’s railway network. The contract, which is scheduled to be complete at the beginning of 2017, includes operation and service support for the first three years. Kapsch will be installing an end-to-end railway telecommunication network based on the GSM-R standard, including a modern IP
  • Solar-powered logging stud
    June 27, 2012
    Clearview Traffic has launched the M210 solar-powered logging stud, which the company claims is a unique and innovative solution for accurately counting vehicles on a wide range of roads. As the company points out, on roads which have no counting systems installed, long-term trends are often completely invisible. However, installing a wide network of loop-based traffic counters is often not economically practical due to the costs of installing and maintaining these devices.
  • Lidar lets planners see big picture in Chattanooga
    April 14, 2025
    The city of Chattanooga, Tennessee, is attempting to make its streets safer by using the largest deployment of Lidar-based traffic detection in the US. Adam Hill reports…