Skip to main content

Zero emission delivery vehicle project begins in Houston

The Houston-Galveston Area Council (H-GAC) has teamed up with the Center for Transportation and the Environment (CTE) and Smith Electric Vehicles Corporation to reduce vehicle emissions from delivery trucks in the region. As part of a US Department of Energy (DOE) sponsored effort, local fleets will replace existing diesel delivery vehicles with thirty all-electric medium and heavy-duty Smith Newton trucks for daily operations in the Houston-Galveston area.
September 2, 2013 Read time: 2 mins
The Houston-Galveston Area Council (H-GAC) has teamed up with the Center for Transportation and the Environment (CTE) and 3822 Smith Electric Vehicles Corporation to reduce vehicle emissions from delivery trucks in the region.  As part of a US Department of Energy (DOE) sponsored effort, local fleets will replace existing diesel delivery vehicles with thirty all-electric medium and heavy-duty Smith Newton trucks for daily operations in the Houston-Galveston area.

The project is designed to demonstrate the effectiveness of all-electric delivery vehicles to perform at the same level of operation as similarly-sized diesel delivery vehicles while significantly reducing emissions and petroleum use.  By deploying emission trucks for this program, H-GAC expects to reduce petroleum consumption by over 250,000 gallons of diesel fuel over the two-year demonstration period. The project will have additional impact with an expected reduction in GHG emissions by 37.5 million tons of carbon equivalents per year and an expected reduction in criteria pollutants of over 2,000 tons per year.

The Smith Newton trucks include the company’s proprietary Smith Power, with variable 40-120 kWh battery pack options; Smith Drive, and Smith Link, an onboard system for monitoring the vehicle’s vital statistics.  The vehicles that will be deployed under this grant are based on Smith’s latest production model Series 2000, which has been fully deployed in several locations across the country.

Each Smith Newton will be delivered with an electric vehicle charging station (EVSE).  Fully recharging the vehicle will take approximately 6 to 10 hours per night, depending on the size of the battery pack and the state of charge when the vehicle returns to the fleet depot.

The H-GAC zero emission truck project will serve as a pioneer for this innovative clean technology by helping fleets deploy all-electric delivery trucks that will improve their fleet operations and benefit the local community. CTE, a non-profit and leader in alternative transportation technology deployments, will manage the project, collect operational data, and report on the project’s impact.   The combined efforts of project partners will help further the objective of developing a market for this advanced electric transportation technology.

Related Content

  • January 10, 2019
    New Flyer to deliver nearly 200 diesel-electric buses to Massachusetts
    New Flyer of America is to deliver 194 heavy-duty Xcelsior diesel-electric transit buses to Massachusetts to replace buses which are at the end of their life. The Massachusetts Bay Transportation Authority (MBTA) placed the order in 2010 and now has more than 200 forty-foot and 70 sixty-foot diesel-electric buses in operation. The hybrid buses, supported by Federal Transit Administration (FTA) grants, will replace end-of-life vehicles. MBTA ordered its first New Flyer hybrid bus in 2010, and now has
  • April 11, 2012
    Hydrogen filling station operating in California
    Linde North America, a specialist in the design, construction and operation of hydrogen vehicle fuelling systems, has commissioned an installation at AC Transit, the bus operator for 13 cities in the East Bay Area, including Emeryville, Oakland and Berkeley, and also operates trans-bay service to San Francisco. The Emeryville hydrogen fuelling station, which is now fuelling 12 fuel cell buses and up to 20 passenger cars a day, is one of two Linde is supplying to AC Transit. The second, located at the Oaklan
  • March 23, 2012
    GE Energy forges charger agreement with Coda Automotive
    GE Energy Industrial Solutions has finalised an automotive original equipment manufacturer (OEM) agreement for the sale and distribution of the GE WattStation wall mount electric vehicle (EV) charging station with EV manufacturer, Coda Automotive.
  • September 4, 2018
    ITS instrumental in reducing Texan congestion
    ITS projects in the Houston area have seen costs crunched – and even a system failure has proved valuable in analysing performance. David Crawford reports on developments in the Lone Star state Savings by Texan public agencies are major factors in the recent ITS Texas awards, recognising beneficial initiatives in bridge strike prevention and traffic intersection control. In the first, the Texas Department of Transportation (TxDOT)’s Houston District, covering the state’s most populous city and its surround