Skip to main content

Zero emission delivery vehicle project begins in Houston

The Houston-Galveston Area Council (H-GAC) has teamed up with the Center for Transportation and the Environment (CTE) and Smith Electric Vehicles Corporation to reduce vehicle emissions from delivery trucks in the region. As part of a US Department of Energy (DOE) sponsored effort, local fleets will replace existing diesel delivery vehicles with thirty all-electric medium and heavy-duty Smith Newton trucks for daily operations in the Houston-Galveston area.
September 2, 2013 Read time: 2 mins
The Houston-Galveston Area Council (H-GAC) has teamed up with the Center for Transportation and the Environment (CTE) and 3822 Smith Electric Vehicles Corporation to reduce vehicle emissions from delivery trucks in the region.  As part of a US Department of Energy (DOE) sponsored effort, local fleets will replace existing diesel delivery vehicles with thirty all-electric medium and heavy-duty Smith Newton trucks for daily operations in the Houston-Galveston area.

The project is designed to demonstrate the effectiveness of all-electric delivery vehicles to perform at the same level of operation as similarly-sized diesel delivery vehicles while significantly reducing emissions and petroleum use.  By deploying emission trucks for this program, H-GAC expects to reduce petroleum consumption by over 250,000 gallons of diesel fuel over the two-year demonstration period. The project will have additional impact with an expected reduction in GHG emissions by 37.5 million tons of carbon equivalents per year and an expected reduction in criteria pollutants of over 2,000 tons per year.

The Smith Newton trucks include the company’s proprietary Smith Power, with variable 40-120 kWh battery pack options; Smith Drive, and Smith Link, an onboard system for monitoring the vehicle’s vital statistics.  The vehicles that will be deployed under this grant are based on Smith’s latest production model Series 2000, which has been fully deployed in several locations across the country.

Each Smith Newton will be delivered with an electric vehicle charging station (EVSE).  Fully recharging the vehicle will take approximately 6 to 10 hours per night, depending on the size of the battery pack and the state of charge when the vehicle returns to the fleet depot.

The H-GAC zero emission truck project will serve as a pioneer for this innovative clean technology by helping fleets deploy all-electric delivery trucks that will improve their fleet operations and benefit the local community. CTE, a non-profit and leader in alternative transportation technology deployments, will manage the project, collect operational data, and report on the project’s impact.   The combined efforts of project partners will help further the objective of developing a market for this advanced electric transportation technology.

Related Content

  • March 17, 2016
    Inland waterways can de-stress city roads
    David Crawford looks at an under-utilised solution for city-centre deliveries. The use of rivers and canals for moving freight is a well-established mode in North Western Europe, where it can take advantage of an intensively developed network. In the Netherlands, 40% of the total volume of goods transported internally goes by water; the figure for Flanders (the neighbouring Dutch-speaking region of Belgium) is 11.5%.
  • October 20, 2017
    Volvo launches new version of Volvo 7900 Electric bus
    Volvo buses has launched a new version of its electric bus, Volvo 7900 Electric, with an extended range, more charging options, and increased flexibility for bus operators. It is expected to become operational at the end of 2018. Battery capacity has been extended and is available in 150, 200 and 250 kWh, allowing the bus to run longer between charges. In addition, the batteries can be fast-charged at the route's end stops, via the open and competition-neutral OppCharge interface. It can also be charged
  • January 24, 2012
    Reducing incident clear up times, saving money
    In 2007 in Atlanta, Georgia, it took over four hours to open the road after a major commercial vehicle incident. Not any more. Four years ago the Texas Transportation Institute (TTI) cited Atlanta, Georgia as the third-most congested city in the United States. Each traveller in metro Atlanta lost an incredible 57 hours a year to traffic delays, wasting 40 gallons of fuel while sitting in traffic. In 2007, it took nearly four and a half hours to open travel lanes after an average tractor-trailer incident. Th
  • July 22, 2016
    EU sets emissions targets to 2030, richer countries bear the burden
    The UK’s Freight Transport Association (FTA) and FIA Europe have welcomed the European Commission’s package of measures, presented this week, to accelerate the transition to low carbon emissions in all sectors of the economy in Europe. The EU says the measures set clear and fair guiding principles to Member States to prepare for the future and keep Europe competitive. Responding to the announcement, the FTA said that the proposed measures are a step in the right direction to reducing freight carbon e