Skip to main content

Zero emission delivery vehicle project begins in Houston

The Houston-Galveston Area Council (H-GAC) has teamed up with the Center for Transportation and the Environment (CTE) and Smith Electric Vehicles Corporation to reduce vehicle emissions from delivery trucks in the region. As part of a US Department of Energy (DOE) sponsored effort, local fleets will replace existing diesel delivery vehicles with thirty all-electric medium and heavy-duty Smith Newton trucks for daily operations in the Houston-Galveston area.
September 2, 2013 Read time: 2 mins
The Houston-Galveston Area Council (H-GAC) has teamed up with the Center for Transportation and the Environment (CTE) and 3822 Smith Electric Vehicles Corporation to reduce vehicle emissions from delivery trucks in the region.  As part of a US Department of Energy (DOE) sponsored effort, local fleets will replace existing diesel delivery vehicles with thirty all-electric medium and heavy-duty Smith Newton trucks for daily operations in the Houston-Galveston area.

The project is designed to demonstrate the effectiveness of all-electric delivery vehicles to perform at the same level of operation as similarly-sized diesel delivery vehicles while significantly reducing emissions and petroleum use.  By deploying emission trucks for this program, H-GAC expects to reduce petroleum consumption by over 250,000 gallons of diesel fuel over the two-year demonstration period. The project will have additional impact with an expected reduction in GHG emissions by 37.5 million tons of carbon equivalents per year and an expected reduction in criteria pollutants of over 2,000 tons per year.

The Smith Newton trucks include the company’s proprietary Smith Power, with variable 40-120 kWh battery pack options; Smith Drive, and Smith Link, an onboard system for monitoring the vehicle’s vital statistics.  The vehicles that will be deployed under this grant are based on Smith’s latest production model Series 2000, which has been fully deployed in several locations across the country.

Each Smith Newton will be delivered with an electric vehicle charging station (EVSE).  Fully recharging the vehicle will take approximately 6 to 10 hours per night, depending on the size of the battery pack and the state of charge when the vehicle returns to the fleet depot.

The H-GAC zero emission truck project will serve as a pioneer for this innovative clean technology by helping fleets deploy all-electric delivery trucks that will improve their fleet operations and benefit the local community. CTE, a non-profit and leader in alternative transportation technology deployments, will manage the project, collect operational data, and report on the project’s impact.   The combined efforts of project partners will help further the objective of developing a market for this advanced electric transportation technology.

For more information on companies in this article

Related Content

  • PBSC expands Bixi Montréal’s e-bike fleet
    September 5, 2019
    PBSC Urban Solutions is adding 120 electric bikes to Bixi Montréal’s fleet in a pilot project taking place in the Canadian province until 15 November. PBSC says its E-Fit’s central motor propels riders up to 32km/h on a full charge and has an autonomy range of up to 70km. Bixi’s fleet of trucks and warehouse in Montréal will be used to recharge the E-Fit batteries. The E-Fit electric pedal-assist bikes can be docked at any station in the network and are available to Bixi members and casual riders via th
  • Developments in signal head lens technology
    February 3, 2012
    Heads and tails Leading manufacturers of traffic signal systems discuss developments in signal head technology as well as some of the legacy issues which affect future deployments Transparent model of Dambach's ACTROS.line technology, showing the bus electronics in the signal head Cowls could be superseded by the greater use of lens technology
  • US announces major EV infrastructure boost
    February 16, 2023
    Biden-Harris Administration says measures mean "great American road trip can be electrified"
  • Infrastructure funding and road user charging – debate continues
    February 1, 2012
    Jack Opiola provides an overview of the ongoing debate over US infrastructure funding and the progress – or lack of it – towards vehicles miles travelled road user charging. The future funding of transportation and mobility infrastructure is attracting increased attention. There has been sharp debate in the US, where landmark reports from the National Surface Transportation Infrastructure Financing Commission and the National Surface Transportation Policy and Revenue Study Commission both stated that the cu