Skip to main content

Zero emission delivery vehicle project begins in Houston

The Houston-Galveston Area Council (H-GAC) has teamed up with the Center for Transportation and the Environment (CTE) and Smith Electric Vehicles Corporation to reduce vehicle emissions from delivery trucks in the region. As part of a US Department of Energy (DOE) sponsored effort, local fleets will replace existing diesel delivery vehicles with thirty all-electric medium and heavy-duty Smith Newton trucks for daily operations in the Houston-Galveston area.
September 2, 2013 Read time: 2 mins
The Houston-Galveston Area Council (H-GAC) has teamed up with the Center for Transportation and the Environment (CTE) and 3822 Smith Electric Vehicles Corporation to reduce vehicle emissions from delivery trucks in the region.  As part of a US Department of Energy (DOE) sponsored effort, local fleets will replace existing diesel delivery vehicles with thirty all-electric medium and heavy-duty Smith Newton trucks for daily operations in the Houston-Galveston area.

The project is designed to demonstrate the effectiveness of all-electric delivery vehicles to perform at the same level of operation as similarly-sized diesel delivery vehicles while significantly reducing emissions and petroleum use.  By deploying emission trucks for this program, H-GAC expects to reduce petroleum consumption by over 250,000 gallons of diesel fuel over the two-year demonstration period. The project will have additional impact with an expected reduction in GHG emissions by 37.5 million tons of carbon equivalents per year and an expected reduction in criteria pollutants of over 2,000 tons per year.

The Smith Newton trucks include the company’s proprietary Smith Power, with variable 40-120 kWh battery pack options; Smith Drive, and Smith Link, an onboard system for monitoring the vehicle’s vital statistics.  The vehicles that will be deployed under this grant are based on Smith’s latest production model Series 2000, which has been fully deployed in several locations across the country.

Each Smith Newton will be delivered with an electric vehicle charging station (EVSE).  Fully recharging the vehicle will take approximately 6 to 10 hours per night, depending on the size of the battery pack and the state of charge when the vehicle returns to the fleet depot.

The H-GAC zero emission truck project will serve as a pioneer for this innovative clean technology by helping fleets deploy all-electric delivery trucks that will improve their fleet operations and benefit the local community. CTE, a non-profit and leader in alternative transportation technology deployments, will manage the project, collect operational data, and report on the project’s impact.   The combined efforts of project partners will help further the objective of developing a market for this advanced electric transportation technology.

For more information on companies in this article

Related Content

  • ABB to deliver fast charging solution to Denmark
    June 1, 2018
    Asea Brown Boveri (ABB) will deliver four electric buses and a fast charger to the city of Aarhus, Denmark, and its bus operator Busselskabet Aarhus Sporveje. The vehicles will replace four diesel buses to combat air pollution and they are expected to be operational by August 2019. ABB’s 300kW OppCharge platform will be located at the end point of the 15km long route of line 13, where the buses will be recharged. OppCharge can power single and double-deck electric buses using a pantograph to connect the
  • IRD joins Canadian data vault project
    April 9, 2021
    IRD will collect roadside data to improve resilience of Canada’s prairie road network
  • New EV chargers from ABB
    April 12, 2013
    Switzerland based ABB has launched the Terra SmartConnect (SC) fast chargers for electric vehicles (EV) in North America. Terra SC will be available with support for the CHAdeMO fast-charging standard, with SAE/combined charging system and will be made available in the Americas in second quarter of 2013. According to the company, the Terra SC can fully charge an electric car in thirty to 120 minutes and charge the battery of currently available EVs from 30 per cent to 80 per cent in about half an hour. The
  • ANPR cameras considered for Severn Bridge restrictions
    April 15, 2025
    Wales-England crossing was built in 1966 and carries M48 motorway