Skip to main content

Zero emission delivery vehicle project begins in Houston

The Houston-Galveston Area Council (H-GAC) has teamed up with the Center for Transportation and the Environment (CTE) and Smith Electric Vehicles Corporation to reduce vehicle emissions from delivery trucks in the region. As part of a US Department of Energy (DOE) sponsored effort, local fleets will replace existing diesel delivery vehicles with thirty all-electric medium and heavy-duty Smith Newton trucks for daily operations in the Houston-Galveston area.
September 2, 2013 Read time: 2 mins
The Houston-Galveston Area Council (H-GAC) has teamed up with the Center for Transportation and the Environment (CTE) and 3822 Smith Electric Vehicles Corporation to reduce vehicle emissions from delivery trucks in the region.  As part of a US Department of Energy (DOE) sponsored effort, local fleets will replace existing diesel delivery vehicles with thirty all-electric medium and heavy-duty Smith Newton trucks for daily operations in the Houston-Galveston area.

The project is designed to demonstrate the effectiveness of all-electric delivery vehicles to perform at the same level of operation as similarly-sized diesel delivery vehicles while significantly reducing emissions and petroleum use.  By deploying emission trucks for this program, H-GAC expects to reduce petroleum consumption by over 250,000 gallons of diesel fuel over the two-year demonstration period. The project will have additional impact with an expected reduction in GHG emissions by 37.5 million tons of carbon equivalents per year and an expected reduction in criteria pollutants of over 2,000 tons per year.

The Smith Newton trucks include the company’s proprietary Smith Power, with variable 40-120 kWh battery pack options; Smith Drive, and Smith Link, an onboard system for monitoring the vehicle’s vital statistics.  The vehicles that will be deployed under this grant are based on Smith’s latest production model Series 2000, which has been fully deployed in several locations across the country.

Each Smith Newton will be delivered with an electric vehicle charging station (EVSE).  Fully recharging the vehicle will take approximately 6 to 10 hours per night, depending on the size of the battery pack and the state of charge when the vehicle returns to the fleet depot.

The H-GAC zero emission truck project will serve as a pioneer for this innovative clean technology by helping fleets deploy all-electric delivery trucks that will improve their fleet operations and benefit the local community. CTE, a non-profit and leader in alternative transportation technology deployments, will manage the project, collect operational data, and report on the project’s impact.   The combined efforts of project partners will help further the objective of developing a market for this advanced electric transportation technology.

For more information on companies in this article

Related Content

  • City of Cambridge partners with Volpe on truck side guards
    May 28, 2015
    The City of Cambridge, Massachusetts is partnering with Volpe, the National Transportation Systems Center, to install truck side guards on city-owned trucks in order to enhance safety for pedestrians and bicyclists travelling in Cambridge. The city intends to install these side guards on heavy-duty vehicles in an effort to lead by example in Massachusetts and to encourage private entities to do the same.
  • Pollution has more than one solution
    April 7, 2014
    Professor Alexander Baklanov of the World Meteorological Organization talks to Colin Sowman about the difficulties of reducing urban pollution. The inhabitants of Beijing have recently been suffering pollution levels 20 times the World Health Organisation’s recommended limit while the European Union is revitalising its efforts to implement and enforce air quality standards. Almost inevitably much of the clean-up efforts are likely to focus on traffic planners and engineers.
  • ITS benefits escape public
    June 8, 2015
    John Kendall considers the public’s awareness of the benefits of ITS. While the results of developing ITS technology may be clear to readers of ITS International, there is far less evidence that drivers have any appreciation of what the technology is doing for them. So how aware are drivers of the developments that are designed to make their journeys less congested and safer?
  • North America's first public-use quick-charge station for EVs opens
    January 31, 2012
    Portland General Electric, Oregon’s largest utility, and NEC Corporation, a leading network, communications and information technology company, have opened North America’s first public-use, quick-charge station for electric vehicles.