Skip to main content

WSP/Parsons Brinckerhoff designing segment of I-4 in Florida

As part of its I-4 Ultimate and Beyond the Ultimate widening projects, the Florida Department of Transportation (FDOT) has awarded a contract to WSP/Parsons Brinckerhoff to design the reconstruction and widening of a nine-mile segment of I-4 in Seminole County. The project involves reconstruction and widening of I-4 from the existing six-lane divided interstate to a ten-lane divided interstate. The concept design proposes the addition of two new barrier-separated express lanes in each direction for a tot
January 6, 2016 Read time: 2 mins
As part of its I-4 Ultimate and Beyond the Ultimate widening projects, the 4503 Florida Department of Transportation (FDOT) has awarded a contract to WSP/4983 Parsons Brinckerhoff to design the reconstruction and widening of a nine-mile segment of I-4 in Seminole County.

The project involves reconstruction and widening of I-4 from the existing six-lane divided interstate to a ten-lane divided interstate. The concept design proposes the addition of two new barrier-separated express lanes in each direction for a total of ten lanes. The project also includes reconstruction of several interchanges and arterial roads at those interchanges in order to relieve the traffic that backs up all the way to the interchanges.

Under its contract, WSP/Parsons Brinckerhoff will be the prime designer responsible for overall project management; design of the roadway, drainage and structures; intelligent transportation systems and traffic design; public involvement; utility coordination; and express lane design. The firm will advance the design to approximately 50 per cent completion in order to obtain all necessary permits and establish right–of-way requirements.

Related Content

  • February 14, 2014
    Parsons Brinckerhoff to provide quality control for Cleveland bridge
    Parsons Brinckerhoff is part of the winning design-build team selected by the Ohio Department of Transportation (ODOT) to provide design and construction for the new George V. Voinovich, I-90 Cleveland Inner belt Eastbound Bridge project. Led by the TGR joint venture, comprising Trumbull Corporation, the Great Lakes Construction Company, and the Ruhlin Company, Parsons Brinckerhoff is serving as the independent quality firm (IQF). The eastbound bridge is part of a phased project that will ultimately de
  • November 24, 2014
    Parsons Brinckerhoff to evaluate Babylon transportation
    Parsons Brinckerhoff has been awarded a contract by the Town of Babylon to conduct an Alternatives Analysis for Route 110 within the towns of Babylon and Huntington in Suffolk County, New York. The purpose of the study is to evaluate transportation demand in the Route 110 corridor, manage congestion, maximise environmental benefits and enhance economic competitiveness.
  • June 2, 2016
    Michigan DOT awards WSP/Parsons Brinckerhoff CV contracts
    The Michigan Department of Transportation (MDOT) has awarded two contracts to WSP/ Parsons Brinckerhoff for the development of connected vehicle initiatives throughout the state. The company will act as on-call consultant for MDOT’s state-wide connected vehicle program for a period of three years, providing such services as planning and strategy development, design and deployment of foundational system elements, public outreach and progress reporting and development of industry partnerships. In additi
  • July 7, 2015
    JMT/Parsons Brinckerhoff JV to consult on Maryland bridge replacement
    The Maryland Transportation Authority (MDTA) has selected a joint venture of Johnson, Mirmiran and Thompson (JMT) and Parsons Brinckerhoff as general engineering consultant for the replacement of the Harry W. Nice Memorial Bridge. The bridge, also known as the Potomac River Bridge, is a 1.7-mile (2.7 km), two-lane continuous truss bridge on US 301 that spans the Potomac River between Newburg in Maryland and Dahlgren in Virginia. The US$1 billion programmed budget involves replacing the existing structure