Skip to main content

WSP/Parsons Brinckerhoff designing segment of I-4 in Florida

As part of its I-4 Ultimate and Beyond the Ultimate widening projects, the Florida Department of Transportation (FDOT) has awarded a contract to WSP/Parsons Brinckerhoff to design the reconstruction and widening of a nine-mile segment of I-4 in Seminole County. The project involves reconstruction and widening of I-4 from the existing six-lane divided interstate to a ten-lane divided interstate. The concept design proposes the addition of two new barrier-separated express lanes in each direction for a tot
January 6, 2016 Read time: 2 mins
As part of its I-4 Ultimate and Beyond the Ultimate widening projects, the 4503 Florida Department of Transportation (FDOT) has awarded a contract to WSP/4983 Parsons Brinckerhoff to design the reconstruction and widening of a nine-mile segment of I-4 in Seminole County.

The project involves reconstruction and widening of I-4 from the existing six-lane divided interstate to a ten-lane divided interstate. The concept design proposes the addition of two new barrier-separated express lanes in each direction for a total of ten lanes. The project also includes reconstruction of several interchanges and arterial roads at those interchanges in order to relieve the traffic that backs up all the way to the interchanges.

Under its contract, WSP/Parsons Brinckerhoff will be the prime designer responsible for overall project management; design of the roadway, drainage and structures; intelligent transportation systems and traffic design; public involvement; utility coordination; and express lane design. The firm will advance the design to approximately 50 per cent completion in order to obtain all necessary permits and establish right–of-way requirements.

Related Content

  • September 22, 2016
    Highway upgrade features Australian first intersection design
    A new interchange design to improve traffic management will be a key part of a major Queensland, Australia road project, with the contract awarded today for a US$712 million (AU$929.3 million) upgrade to the Bruce Highway between Caloundra Road and the Sunshine Motorway. Minister for Infrastructure and Transport Darren Chester and Queensland Main Roads Minister Mark Bailey today announced a Fulton Hogan Seymour Whyte joint venture had won the contract for the project, which aims to ultimately reduce cong
  • October 3, 2016
    WSP/Parsons Brinckerhoff announces latest senior hires
    WSP/Parsons Brinckerhoff has appointed three technical directors to its team. Carol Stitchman joins as rail technical director from Network Rail, based in Birmingham. As part of her new role, and as a member of the UK rail stations management team, Carol will strengthen the consultancy’s expertise in delivering major stations work including high speed rail. In May 2016, Carol won both the Best Woman Architect and the Most Distinguished Winner of 2016 at the European Women in Construction & Engineer
  • June 5, 2015
    Tolling is the 21st century’s road funding solution
    HNTB’s Rick Herrington and Brad Guilmino put the case for tolling. Tolling is becoming the 21st century solution of choice for generating additional user-based transportation revenue. The proven funding source is being seriously considered for expanded use by cities, states and even the federal government with support from elected officials across the political spectrum. In fact, with each federal transportation reauthorisation, tolling restrictions have been relaxed.
  • May 11, 2017
    Lindsay zips-up lane closure solution
    Moveable barrier systems are offering engineers a new traffic management options. Work zones - be they for maintenance or road widening - are a fact of life and when they occur on major highways, they create no end of problems for traffic planners and travellers alike.