Skip to main content

WSP/Parsons Brinckerhoff designing new bridge in Florida

WSP /Parsons Brinckerhoff will design a new bridge in Pensacola, Florida as part of a design-build team led by Skanska. The project is being undertaken on behalf of the Florida Department of Transportation. The US$398.5 million project includes design and construction of new westbound and eastbound bridges on Route 30 (US 98) to replace the existing three-mile-long bridge that links the communities of Pensacola and Gulf Breeze. The project also includes shared-use paths on the outside of each bridge, rec
November 15, 2016 Read time: 2 mins
8556 WSP | Parsons Brinckerhoff  will design a new bridge in Pensacola, Florida as part of a design-build team led by 7136 Skanska. The project is being undertaken on behalf of the 4503 Florida Department of Transportation.

The US$398.5 million project includes design and construction of new westbound and eastbound bridges on Route 30 (US 98) to replace the existing three-mile-long bridge that links the communities of Pensacola and Gulf Breeze. The project also includes shared-use paths on the outside of each bridge, reconstruction of the bridge approaches, and improvements to public facilities in the Gulf Breeze Wayside Park.

The new bridge is intended to be an iconic structure that increases capacity, driver safety and offers an unmatched pedestrian experience, encouraging walkers and cyclists to explore and enjoy the journey from shore-to-shore. At night, the bridge will provide a ribbon of light across the bay.

The bridge will feature a wishbone tied arch main span. The arches are designed to maximise the visual impact from all perspectives and provide a durable, easily maintained structure. The architectural details of the tower- supported shade structures and piers mimic the arch’s wishbone, providing aesthetically pleasing views from both the low- and high-level portions of the bridge. Lighting, railings, surface finishes and other details are detailed to accentuate the architecture.

Construction on the project is expected to begin in the spring of 2017 with completion scheduled for the summer of 2020.

For more information on companies in this article

Related Content

  • Asking drivers what information they need: radical but effective
    March 19, 2014
    When Texas A&M Transportation Institute was asked to devise a temporary traveller information system for work zones, it started by asking drivers what they need. Robert Brydia explains the thinking, implementation and results. US Interstate 35 (I-35) runs roughly north–south originating in Laredo, Texas and ends 1,500 miles away in Duluth, Minnesota having passed through Oklahoma, Kansas, Missouri and Iowa. Within Texas the I-35 splits into I-35E and I-35W passing through Dallas and Fort Worth respectiv
  • Atkins named lead designer for major freeway project in Nevada
    December 14, 2015
    Atkins North America is to play a key role in the development of a freeway that aims to boost safety, mobility and accessibility in Las Vegas. Considered the most important and ambitious project in Nevada Department of Transportation's (NDOT) history, it also accommodates regional economic redevelopment through improved access to downtown Las Vegas and the Resort Corridor. As design lead on the team led by Kiewit Infrastructure West, Atkins will manage all design and engineering services for NDOT’s Pr
  • Data helps Ohio DoT get grant money
    January 25, 2022
    Ohio Department of Transportation turned to StreetLight Data when it needed to finalise grant money for a key infrastructure link. David Crawford sees how metrics brought in the cash…
  • UK council trials first UV powered pathway
    October 21, 2013
    An innovative re-surfacing technology that generates its own energy during the day while enhancing visibility at night is being trialled by Cambridge City Council in the UK. Starpath, developed by Surrey-based Pro-Teq Surfacing, is a liquid-based re-surfacing product that absorbs and stores energy from ambient light (UV rays) during the day, then releases this energy at night, allowing the particles to glow. It has recently been applied to an existing pedestrian and cycle way pathway that runs through h