Skip to main content

WSP/Parsons Brinckerhoff designing new bridge in Florida

WSP /Parsons Brinckerhoff will design a new bridge in Pensacola, Florida as part of a design-build team led by Skanska. The project is being undertaken on behalf of the Florida Department of Transportation. The US$398.5 million project includes design and construction of new westbound and eastbound bridges on Route 30 (US 98) to replace the existing three-mile-long bridge that links the communities of Pensacola and Gulf Breeze. The project also includes shared-use paths on the outside of each bridge, rec
November 15, 2016 Read time: 2 mins
8556 WSP | Parsons Brinckerhoff  will design a new bridge in Pensacola, Florida as part of a design-build team led by 7136 Skanska. The project is being undertaken on behalf of the 4503 Florida Department of Transportation.

The US$398.5 million project includes design and construction of new westbound and eastbound bridges on Route 30 (US 98) to replace the existing three-mile-long bridge that links the communities of Pensacola and Gulf Breeze. The project also includes shared-use paths on the outside of each bridge, reconstruction of the bridge approaches, and improvements to public facilities in the Gulf Breeze Wayside Park.

The new bridge is intended to be an iconic structure that increases capacity, driver safety and offers an unmatched pedestrian experience, encouraging walkers and cyclists to explore and enjoy the journey from shore-to-shore. At night, the bridge will provide a ribbon of light across the bay.

The bridge will feature a wishbone tied arch main span. The arches are designed to maximise the visual impact from all perspectives and provide a durable, easily maintained structure. The architectural details of the tower- supported shade structures and piers mimic the arch’s wishbone, providing aesthetically pleasing views from both the low- and high-level portions of the bridge. Lighting, railings, surface finishes and other details are detailed to accentuate the architecture.

Construction on the project is expected to begin in the spring of 2017 with completion scheduled for the summer of 2020.

Related Content

  • January 18, 2013
    Transit hub promised in San Diego area
    San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations. This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces. “This will be our flagship station,” said Frank Owsiany, who ov
  • December 3, 2012
    Parsons Brinckerhoff appointed by Transport for Greater Manchester
    Parsons Brinckerhoff, the international engineering consultant, has been appointed to provide a broad range of specialist services to Transport for Greater Manchester under the UK authority’s new Transport Professional Services framework, to help deliver much-needed improvements to transport infrastructure across the region. Under the new four-year framework agreement, Parsons Brinckerhoff will provide a range of services including transport systems, transport planning, environmental planning and engineerin
  • April 25, 2023
    Daktronics has a crystal-clear message
    Visitors to the Daktronics booth will experience what it’s like to have LED screens in a traffic management centre (TMC).
  • March 12, 2012
    Vendor's eye view of US economic stimulus programme
    Pete Goldin explores the impact of the US economic stimulus programme on the ITS industry from the ITS vendor perspective