Skip to main content

WSP/Parsons Brinckerhoff designing new bridge in Florida

WSP /Parsons Brinckerhoff will design a new bridge in Pensacola, Florida as part of a design-build team led by Skanska. The project is being undertaken on behalf of the Florida Department of Transportation. The US$398.5 million project includes design and construction of new westbound and eastbound bridges on Route 30 (US 98) to replace the existing three-mile-long bridge that links the communities of Pensacola and Gulf Breeze. The project also includes shared-use paths on the outside of each bridge, rec
November 15, 2016 Read time: 2 mins
8556 WSP | Parsons Brinckerhoff  will design a new bridge in Pensacola, Florida as part of a design-build team led by 7136 Skanska. The project is being undertaken on behalf of the 4503 Florida Department of Transportation.

The US$398.5 million project includes design and construction of new westbound and eastbound bridges on Route 30 (US 98) to replace the existing three-mile-long bridge that links the communities of Pensacola and Gulf Breeze. The project also includes shared-use paths on the outside of each bridge, reconstruction of the bridge approaches, and improvements to public facilities in the Gulf Breeze Wayside Park.

The new bridge is intended to be an iconic structure that increases capacity, driver safety and offers an unmatched pedestrian experience, encouraging walkers and cyclists to explore and enjoy the journey from shore-to-shore. At night, the bridge will provide a ribbon of light across the bay.

The bridge will feature a wishbone tied arch main span. The arches are designed to maximise the visual impact from all perspectives and provide a durable, easily maintained structure. The architectural details of the tower- supported shade structures and piers mimic the arch’s wishbone, providing aesthetically pleasing views from both the low- and high-level portions of the bridge. Lighting, railings, surface finishes and other details are detailed to accentuate the architecture.

Construction on the project is expected to begin in the spring of 2017 with completion scheduled for the summer of 2020.

Related Content

  • March 1, 2012
    Innovative use of CCTV on Niantic River Movable Bridge Project
    Earthcam has revealed an innovative construction camera deployment on the Niantic River Movable Bridge Project in Connecticut where work began in February on an Amtrak railroad bridge scheduled for completion in May, 2013.
  • September 6, 2017
    Remote remedies help US authorities identify bridge deficiencies
    Every day 185 million vehicles – cars, trucks, school buses, emergency response units - cross one or more of America’s 55,710 'structurally compromised' steel and concrete road bridges, the highest concentration of which are in Iowa (nearly 5,000), Pennsylvania and Oklahoma. Nearly 2,000 of these crossings are located on interstate highways, according to the American Road and Transportation Builders Association's recent analysis of the US Department of Transportation's 2016 National Bridge Inventory.
  • July 30, 2013
    Virginia presses ahead with tunnels upgrade despite tolls challenge
    David Crawford reviews current developments and legal/financial issues facing tunnel management in Virginia. This autumn the Virginia Department of Transportation (VDOT) in the US will defend its plan to introduce tolling on the Elizabeth River tunnels linking the cities of Norfolk and Portsmouth in the State’s Hampton Roads area. The tolling, which is due to start from February 2014, will be examined by the State’s Supreme Court later this year. The anticipated toll income, along with loans and bonds, is
  • January 9, 2018
    Making the most of Michigan
    Michigan DoT’s Kirk Steudle takes time out from the ITS World Congress in Montreal to talk to Colin Sowman. Thirty years ago, a professional engineer named Kirk Steudle joined Michigan Department of Transportation (MDoT). Today he’s the state transportation director, responsible for more than 16,000km (10,000 miles) of state highways (including 4,000 bridges), some 2,500 employees and a budget of more than $4 billion. We caught up with Steudle during the ITS World Congress in Montreal and asked how he