Skip to main content

Work to begin on M1 improvements

Work on the M1 Junction 19 improvement scheme near Catthorpe, Leicestershire, will start in January, UK roads minster Robert Goodwill has announced today. The US$312.7 million scheme will reduce congestion and improve journey time reliability and safety by replacing the existing junction with a three-level junction and improving roads between the villages of Catthorpe and Swinford so local traffic can avoid the junction.
December 11, 2013 Read time: 2 mins
Work on the M1 Junction 19 improvement scheme near Catthorpe, Leicestershire, will start in January, UK roads minster Robert Goodwill has announced today.

The US$312.7 million scheme will reduce congestion and improve journey time reliability and safety by replacing the existing junction with a three-level junction and improving roads between the villages of Catthorpe and Swinford so local traffic can avoid the junction.

Goodwill said: “The 142,000 vehicles that pass through Catthorpe junction every day demonstrate how important this route is. However, the current layout of Catthorpe is unable to meet this demand, giving rise to congestion, delays, accidents and conflict between local and longer-distance traffic. Without improvement these problems will get worse. “I am delighted to announce that construction will start in January, showing our commitment to deliver much need improvements to England’s infrastructure.”

The M1 Junction 19 Improvement Scheme will provide several direct free-flow links: A14 to M1 northbound; M1 southbound to A14; M6 to A14 in both directions; M6 to M1 southbound; and M1 northbound to M6. The M1 will remain on its current alignment. Improvements to the local road network will include: a new link between Rugby Road and Shawell Lane north of the M6; a local route under the junction between Swinford and Catthorpe; and improvements to Shawell Lane/Catthorpe Lane, between Catthorpe Road and the M6 to the east and towards the A5 to the west.

Related Content

  • October 28, 2016
    Work begins on Warrington motorway trial to cut congestion
    Work on a US$8.5 million (£7 million) pilot scheme to cut congestion along the M62 near Warrington in Cheshire, UK is to start next month. Highways England is delivering the innovative project at Croft Interchange to give drivers smoother and more reliable journeys along the eastbound M62, one of the busiest commuter congestion hotspots in the region. From next summer, smart motorway technology, such as electronic information signs and variable mandatory speed limits on the M62, will be used alongside
  • March 24, 2023
    How digital navigation is key to managing congestion
    Satnav – not costly civil engineering projects – might point us towards better management of congested road networks, argues David Metz of University College London
  • January 30, 2012
    Managed motorways, hard shoulder running aids safety, saves time
    The announcement that, in 2012/13, work to extend Managed Motorways to Junctions 5-8 of the M6 near Birmingham in the West Midlands is scheduled to start marks the next step for the UK's hard shoulder running concept, first introduced on the M42 in 2006. The M6 scheme is in fact one of several announced; over the next few years work will start on applying Managed Motorways to various sections of the M1, M25 London Orbital, M60 and M62. According to Paul Unwin, senior project manager with the Highways Agency
  • April 1, 2015
    TomTom traffic index shows increase in UK congestion
    TomTom’s today 5th annual Traffic Index, the barometer of traffic congestion in over 200 cities worldwide, reveals rising congestion levels around the globe In addition, for the first time, the Index took an in-depth look at the true impact of rush hour traffic on the work week, uncovering that evening rush hour nearly doubles the journey time for car commuters. The analysis of 12 trillion pieces of traffic data worldwide revealed that the evening rush hour is the most congested time of day. Traffic co