Skip to main content

Western US governors collaborate on EV corridor

The Governors of Colorado, Utah and Nevada are to work together over the next year to develop complementary plans for building an electric vehicle charging network across key highway corridors in their states. The corridors will include Interstates 70, 76 and 25 across Colorado; Interstates 70, 80 and 15 across Utah; and Interstates 80 and 15 across Nevada. In total, the charging network will connect more than 2,000 miles of highway. This regional electric charging station network aims to address rang
December 22, 2016 Read time: 2 mins
The Governors of Colorado, Utah and Nevada are to work together over the next year to develop complementary plans for building an electric vehicle charging network across key highway corridors in their states.

The corridors will include Interstates 70, 76 and 25 across Colorado; Interstates 70, 80 and 15 across Utah; and Interstates 80 and 15 across Nevada. In total, the charging network will connect more than 2,000 miles of highway.

This regional electric charging station network aims to address range anxiety, the concern that recharging may not be available for long-distance travel or trips outside of major cities. The electrification of major regional corridors is expected to facilitate the vehicle market transformation and allow smaller communities to connect to the regional system.

All three states have electric vehicle market potential. Colorado offers a US$5,000 tax credit on electric vehicle purchases and has nearly 8,000 electric vehicles on the road in Colorado today, compared to less than 100 in 2011. It has also already begun building charging stations through the Charge Ahead Colorado program.

Utah currently ranks seventh in the US for electric vehicle adoption and recently unveiled its Mighty Five Corridor initiative, while Nevada is ranked 13th in the nation for electric vehicles, with 2,104 electric vehicles and 31,937 hybrid vehicles registered in the state. It has a goal to complete an electric highway system serving the entire state by 2020.

Related Content

  • NYC tracks vehicles, installs charging points
    May 29, 2013
    New York City is to get additional automatic licence plate readers (ALPR) and more charging points for electric vehicles. NYPD Commissioner Raymond W Kelly announced the project to install automatic licence plate reader (ALPR) cameras in all traffic lanes on all bridges and tunnels that serve as entrances and exits to Manhattan. The NYPD already has complete coverage on the several bridges and tunnels in the city, and additional cameras will be added to cover other locations. The department has also mounted
  • Mexico and the US slow to adopt ETC interoperability
    April 12, 2013
    Splinteroperability is a word devised by Travis P. Dunn and Victor J. Michelet C. to encapsulate the lack of progress towards ETC harmonisation in the US and Mexico. Five thousand miles of tolled roads and bridges. Widespread implementation of electronic toll collection (ETC) systems. One dominant interoperable ETC service provider covering just over half the nation’s toll facilities. Numerous other ETC service providers offering alternative visions of interoperability. Years of customer requests for better
  • Ramp metering delivers - again
    January 27, 2012
    Though still controversial, ramp metering, which has been around for nearly 50 years, continues to deliver substantial benefits, and generally for relatively small cost. Kansas City is a case in point. In March 2010, Kansas City Scout, a partnership between the Missouri and Kansas Departments of Transportation to provide ITS for the greater Kansas City Area, activated the first ramp metering system in the region. The project is located on an 8.85km (5.5 mile) section of Interstate 435 from Metcalf Avenue to
  • Dutch survey shows drivers are in favour of road user charging
    January 16, 2012
    'Keep it simple, stupid' is an oft-forgotten axiom but in terms of road user charging it is entirely appropriate. So says the ANWB's Ferry Smith. A couple of decades ago, it might have been largely true that the technology aspects of advanced road infrastructure were the main obstacles to deployment. However, 20 years or more of development have led to a situation where such 'obstacles' are often no more than a political fig-leaf. Area-wide Road User Charging (RUC) is a case in point; speak candidly to syst