Skip to main content

Western US governors collaborate on EV corridor

The Governors of Colorado, Utah and Nevada are to work together over the next year to develop complementary plans for building an electric vehicle charging network across key highway corridors in their states. The corridors will include Interstates 70, 76 and 25 across Colorado; Interstates 70, 80 and 15 across Utah; and Interstates 80 and 15 across Nevada. In total, the charging network will connect more than 2,000 miles of highway. This regional electric charging station network aims to address rang
December 22, 2016 Read time: 2 mins
The Governors of Colorado, Utah and Nevada are to work together over the next year to develop complementary plans for building an electric vehicle charging network across key highway corridors in their states.

The corridors will include Interstates 70, 76 and 25 across Colorado; Interstates 70, 80 and 15 across Utah; and Interstates 80 and 15 across Nevada. In total, the charging network will connect more than 2,000 miles of highway.

This regional electric charging station network aims to address range anxiety, the concern that recharging may not be available for long-distance travel or trips outside of major cities. The electrification of major regional corridors is expected to facilitate the vehicle market transformation and allow smaller communities to connect to the regional system.

All three states have electric vehicle market potential. Colorado offers a US$5,000 tax credit on electric vehicle purchases and has nearly 8,000 electric vehicles on the road in Colorado today, compared to less than 100 in 2011. It has also already begun building charging stations through the Charge Ahead Colorado program.

Utah currently ranks seventh in the US for electric vehicle adoption and recently unveiled its Mighty Five Corridor initiative, while Nevada is ranked 13th in the nation for electric vehicles, with 2,104 electric vehicles and 31,937 hybrid vehicles registered in the state. It has a goal to complete an electric highway system serving the entire state by 2020.

Related Content

  • March 1, 2013
    DriveWyze wireless Preclear system speeds weighstation waiting
    Drivewyze aims to revolutionise the way weighstation bypass systems work with its Pre-Clear system. And it’s not just looking at weighstations, either… Pete Goldin reports. Truck drivers know the drill: pull off the high­way at every weighstation and wait. Carriers know the drill, too: every minute spent waiting there translates directly into dollars lost. Traditionally, the only alternative to this scenario is a transponder-based system, which allows trucks to bypass the sites using technology similar to
  • November 1, 2023
    The challenging European road to carbon neutrality and the need for distance-based charging
    Fuel taxes are falling and EVs have the potential to create social equity issues. The answer may lie in expanding the use of technology which has successfully been used for two decades with trucks
  • August 23, 2023
    The inside story of how traffic chaos was avoided after I-95 collapse
    June’s collapse of major US roadway I-95 in Pennsylvania could have caused lengthy traffic chaos. But - relatively speaking at least - it didn’t and gridlock was avoided. Alan Dron finds out why
  • June 1, 2015
    ITS America historic meeting welcomes industry leaders
    Welcome to ITS America’s 25th Annual Meeting Anniversary in Pittsburgh! This historic silver anniversary brings together more than 2,000 of the nation’s top transportation and technology policymakers, business leaders, engineers, investors and researchers. The event’s theme – Bridges to Innovation – is appropriate in that the issues to be discussed and debated and the technologies on display are representative of how important ITS is to America’s – and the world’s – transportation future.