Skip to main content

Western US governors collaborate on EV corridor

The Governors of Colorado, Utah and Nevada are to work together over the next year to develop complementary plans for building an electric vehicle charging network across key highway corridors in their states. The corridors will include Interstates 70, 76 and 25 across Colorado; Interstates 70, 80 and 15 across Utah; and Interstates 80 and 15 across Nevada. In total, the charging network will connect more than 2,000 miles of highway. This regional electric charging station network aims to address rang
December 22, 2016 Read time: 2 mins
The Governors of Colorado, Utah and Nevada are to work together over the next year to develop complementary plans for building an electric vehicle charging network across key highway corridors in their states.

The corridors will include Interstates 70, 76 and 25 across Colorado; Interstates 70, 80 and 15 across Utah; and Interstates 80 and 15 across Nevada. In total, the charging network will connect more than 2,000 miles of highway.

This regional electric charging station network aims to address range anxiety, the concern that recharging may not be available for long-distance travel or trips outside of major cities. The electrification of major regional corridors is expected to facilitate the vehicle market transformation and allow smaller communities to connect to the regional system.

All three states have electric vehicle market potential. Colorado offers a US$5,000 tax credit on electric vehicle purchases and has nearly 8,000 electric vehicles on the road in Colorado today, compared to less than 100 in 2011. It has also already begun building charging stations through the Charge Ahead Colorado program.

Utah currently ranks seventh in the US for electric vehicle adoption and recently unveiled its Mighty Five Corridor initiative, while Nevada is ranked 13th in the nation for electric vehicles, with 2,104 electric vehicles and 31,937 hybrid vehicles registered in the state. It has a goal to complete an electric highway system serving the entire state by 2020.

Related Content

  • Abertis cloud brings clarity to Valencia
    May 18, 2022
    Tolling group will enable dynamic pricing in bid to reduce urban congestion and pollution
  • Cold efficiency
    July 24, 2012
    Tools to support operational decisions in winter maintenance can remove subjectivity and increase efficiency; Vaisala's Danny Johns talks about latest developments Even the presence of trees at the roadside can have an effect on temperature An effective Road Weather Information System (RWIS) network can save a local road authority or jurisdiction tens of thousands of dollars or Euros'-worth of labour and consumables in a single night. Get those winter maintenance operations right over just three or four nig
  • Ecotricity to install UK motorway electric vehicle charge points
    October 1, 2012
    UK company Ecotricity is to install a network of rapid charging points in motorway service stations around the country enabling an electric car to be recharged in around 15 minutes. Conventional charging points usually take several hours to provide enough power for modern electric cars. With a range of around 100 miles, this has meant the vehicles are largely used for short journeys in towns and cities, limiting their uptake by consumers.
  • 2012 US Urban Mobility Report published
    February 8, 2013
    Researchers at the Texas A&M Transportation Institute (TTI) have come up with a way to measure the unreliability of trip times due to traffic congestion. The Planning Time Index (PTI) illustrates the amount of extra time needed to arrive on time for higher priority events, such as an airline departure, just-in-time shipments, medical appointments or especially important social commitments. If the PTI for a particular trip is 3.00, a traveller would allow sixty minutes for a trip that typically takes twenty