Skip to main content

Western US governors collaborate on EV corridor

The Governors of Colorado, Utah and Nevada are to work together over the next year to develop complementary plans for building an electric vehicle charging network across key highway corridors in their states. The corridors will include Interstates 70, 76 and 25 across Colorado; Interstates 70, 80 and 15 across Utah; and Interstates 80 and 15 across Nevada. In total, the charging network will connect more than 2,000 miles of highway. This regional electric charging station network aims to address rang
December 22, 2016 Read time: 2 mins
The Governors of Colorado, Utah and Nevada are to work together over the next year to develop complementary plans for building an electric vehicle charging network across key highway corridors in their states.

The corridors will include Interstates 70, 76 and 25 across Colorado; Interstates 70, 80 and 15 across Utah; and Interstates 80 and 15 across Nevada. In total, the charging network will connect more than 2,000 miles of highway.

This regional electric charging station network aims to address range anxiety, the concern that recharging may not be available for long-distance travel or trips outside of major cities. The electrification of major regional corridors is expected to facilitate the vehicle market transformation and allow smaller communities to connect to the regional system.

All three states have electric vehicle market potential. Colorado offers a US$5,000 tax credit on electric vehicle purchases and has nearly 8,000 electric vehicles on the road in Colorado today, compared to less than 100 in 2011. It has also already begun building charging stations through the Charge Ahead Colorado program.

Utah currently ranks seventh in the US for electric vehicle adoption and recently unveiled its Mighty Five Corridor initiative, while Nevada is ranked 13th in the nation for electric vehicles, with 2,104 electric vehicles and 31,937 hybrid vehicles registered in the state. It has a goal to complete an electric highway system serving the entire state by 2020.

Related Content

  • Investing in ITS: Show us the money
    April 8, 2022
    The ITS industry is currently attracting a lot of interest from private equity and venture capital providers. Adam Hill asks some of the people who have their eyes on the market what makes it such a good bet
  • Ukraine’s ITS in a time of war
    May 12, 2023
    Following invasion by Russia, work on ITS projects has stopped in Ukraine – but the state road agency and private contractors have pivoted to providing essential services instead
  • USDOT finances Ohio River Bridges East End Crossing
    April 17, 2015
    US Transportation Secretary Anthony Foxx has announced a Transportation Infrastructure Finance and Innovation Act (TIFIA) loan of US$162 million from the Department's Federal Highway Administration to finance the East End Crossing section of the Louisville-Southern Indiana Ohio River Bridges Project. At the total cost of US$1.27 billion, the East End Crossing includes the East End Bridge and its connecting roadways. The bridge spans the Ohio River eight miles to the north connecting the east end of Louis
  • Extended EV charging infrastructure launched
    September 12, 2013
    UK city Corby is aiming to be a leading edge business location, with the launch of an extended electric vehicle (EV) charging infrastructure. To complement the EV charge points already at Corby Station and the Corby Cube, charge points have been installed at a range of venues and businesses including the Holiday Inn, Adrenaline Alley and Corby Town Football Club. Corby now has one of the highest concentrations of charge points per head of population in the UK.