Skip to main content

Wabtec to supply components for new transit cars in Denver

Wabtec Corporation has signed contracts worth about US$25 million to provide components, including on-board positive train control (PTC) equipment, for 50 new transit cars being built by Hyundai-Rotem. The cars will be used on new commuter rail lines being built by Denver Transit Partners in Colorado. Several Wabtec units will provide the equipment for the cars: Wabtec Passenger Transit (brakes and couplers), Wabtec Railway Electronics (PTC equipment), Bach-Simpson (event recorders) and Vapor Stone (doors)
July 3, 2012 Read time: 1 min
6079 Wabtec Corporation has signed contracts worth about US$25 million to provide components, including on-board positive train control (PTC) equipment, for 50 new transit cars being built by 6080 Hyundai Rotem. The cars will be used on new commuter rail lines being built by Denver Transit Partners in Colorado.

Several Wabtec units will provide the equipment for the cars:  Wabtec Passenger Transit (brakes and couplers), Wabtec Railway Electronics (PTC equipment), Bach-Simpson (event recorders) and Vapor Stone (doors).

Previously, Wabtec announced a separate, $63 million contract with Denver Transit Partners to provide the dispatching and operations control systems, wayside signalling and communications systems, and related integration and project management services for the new lines.

Known as Eagle P3, Denver's commuter rail project includes three new lines with more than 58kms of track and is expected to be completed in 2016.  The programme is part of a 12-year, multi-billion-dollar public transportation expansion plan in the region.

For more information on companies in this article

Related Content

  • Rail operator deploys Siemens technology for newly opened light rail line
    September 22, 2015
    TriMet's new MAX Orange Line, a light rail project between Portland and Milwaukie in the US incorporates Siemens’ advanced rail technologies, including its S70 light rail vehicles, rail signalling and communication systems and the company's first Sitras SES energy storage unit in the US that uses regenerative braking to sustainably power the line. The 12 kilometre line is the region's sixth construction project of the development project Metropolitan Area Express (MAX) to expand the city's transport net
  • Microgrids & the new power generation
    August 31, 2021
    Public transportation agencies are turning to microgrids to provide critical resilience in the event of local and regional power interruptions. Gordon Feller looks at projects in Maryland, New Jersey and Massachusetts
  • New York pioneers online mobile real-time bus tracking
    May 22, 2012
    An unusual technology collaboration. David Crawford investigates Early in January 2012, the New York City Metropolitan Transportation Authority (MTA) rolled out the first borough-wide implementation of its pioneering Bus Time online mobile real-time tracking service. The system allow commuters to track each bus on every route in real-time on the internet, via smartphones and by text messaging to a mobile phone. The MTA chose Staten Island for its first live launch due to it being the only one of the five Ne
  • Massachusetts DOT unveils five-year transportation plan
    January 14, 2014
    The Massachusetts Department of Transportation (MassDOT) has released the first draft of its five-year MassDOT Capital Investment Plan (CIP) for FY2014-FY2018. The US$12.4 billion program makes long-term investments and represents the first unified, multi-modal capital investment plan covering all MassDOT highway and municipal projects, regional airports, rail and transit, including the MBTA and Regional Transit Authorities. The proposal, which must be approved the state's Department of Transportation