Skip to main content

Victorian government to implement high capacity signalling on new rail line

The Victorian government, Australia has awarded CPB Contractors and Bombardier Transportation the contract to deliver the US$790 million (AU$1 billion) Rail Systems Alliance in Melbourne, which includes the roll-out of a 55 kilometre long high capacity signalling (HCS) and communications system. HCS allows trains to safely run closer together, meaning they can run more often. The technology will enable trains every two to three minutes, creating a ‘turn-up-and-go’ train network for Melbourne. The signalling
July 18, 2017 Read time: 2 mins
The Victorian government, Australia has awarded CPB Contractors and 513 Bombardier Transportation the contract to deliver the US$790 million (AU$1 billion) Rail Systems Alliance in Melbourne, which includes the roll-out of a 55 kilometre long high capacity signalling (HCS) and communications system.


HCS allows trains to safely run closer together, meaning they can run more often. The technology will enable trains every two to three minutes, creating a ‘turn-up-and-go’ train network for Melbourne.

The signalling will operate the 65 new high-capacity trains currently being built in Victoria, which will run on the Sunbury to Cranbourne-Pakenham line via the Metro Tunnel. Dedicated control centres will be built in Dandenong and Sunshine to support the new technology. The centres will be staffed by experts who will monitor trains on the new Metro Tunnel line.

Additionally, expressions of Interest will open this week to deliver the final major works package of Metro Tunnel, the Rail Infrastructure Alliance.

The US$790 million (AU$1 billion) contract will be to design and construct the eastern tunnel entrance in South Yarra, the western tunnel entrance in Kensington and associated works across the Sunbury to Cranbourne-Pakenham corridor, including upgrading track power and conventional signalling.

Related Content

  • May 14, 2013
    Intelligent Transport System for Australia's Monash Freeway
    Sluggish peak-hour traffic on Melbourne's busiest road, the Monash Freeway, will flow about 20 km/h faster when new technology is introduced, thanks to a US$78.2 million cash injection from the Australian Government to help improve traffic flow, with the money to go towards installing and upgrading intelligent transport systems on a 34.5-kilometre stretch of the road in Melbourne's east. The commitment is intended to be matched by the Victorian government and will go towards technology such as variable spee
  • October 28, 2015
    Emissions reductions targets to have major impact on transport
    As bold moves aimed at reducing greenhouse gas emissions have been introduced in California, David Crawford looks at the ramifications for transportation. California Governor Jerry Brown’s recent dramatic raising of the bar on emissions reduction policy for the state has won him praise from Japan, Australia, Europe and the secretariat of the critical UN conference on climate change being held in Paris in November/December 2015. His April 2015 executive order aimed at bringing emissions to 40% below 1990 lev
  • April 10, 2012
    Why integrated traffic management needs a cohesive approach
    Traffic control is increasingly being viewed as one essential element of a wider ‘system of systems’ – the smart city. Jason Barnes, Jon Masters and David Crawford report on latest ideas and efforts for making cities ‘smarter’ Virtually every element of the fabric and utilitarian operations that make urban areas tick can now be found somewhere in the mix that is the ‘smart city’ agenda. Ideas have expanded and projects pursued in different directions as the rhetoric on making cities ‘smarter’ has grown. App
  • April 30, 2015
    US budget proposals seek recognise ITS benefits
    President Obama’s latest budget brings some good news for the transportation and ITS sectors. President Obama’s proposed 2016 budget could see more progress on many of America’s ingrained transportation problems than has been achieved in some time and includes a six-year $478 billion surface transportation reauthorisation. That is, of course, provided it clears all of the administrative hurdles to become law.