Skip to main content

Utrecht tram contracts awarded

Utrecht municipality Bestuur Regio Utrecht (BRU) has awarded the construction of the US$547 million Uithof tram line to Royal Bam Group, with construction set to start next year ready for passenger services in mid-2018. Spanish supplier CAF will be responsible for the supply of 27 low-floor trams with delivery set from January 2017. The contract includes the construction of the eight kilometre-long tram infrastructure, including tram tracks, overhead lines and nine stops.
December 10, 2014 Read time: 1 min
Utrecht municipality Bestuur Regio Utrecht (BRU) has awarded the construction of the US$547 million Uithof tram line to Royal Bam Group, with construction set to start next year ready for passenger services in mid-2018.

Spanish supplier CAF will be responsible for the supply of 27 low-floor trams with delivery set from January 2017.

The contract includes the construction of the eight kilometre-long tram infrastructure, including tram tracks, overhead lines and nine stops.

Related Content

  • China invests in transportation infrastructure
    February 19, 2014
    Construction of the 26.4- kilometre Jinan-Changqing line of the Jinan-Liaocheng railway in China will begin during March 2014. The project includes nine stations and will cost US$2.18 billion in total, out of which US$202 million is scheduled to be invested in 2014. Meanwhile, two cross-river bridge construction projects will be kicked off in Jinan in May 2014. They include a dual-use bridge across the Yellow River that will cost US$262 million and the 13.5- kilometre Changqing Yellow River bridge, which
  • Dutch speed-enforcement contract for Jenoptik
    December 9, 2013
    Robot Nederland, part of Jenoptik’s Traffic Solutions division is to supply over 130 stationary roadside speed measurement systems to the Central Justitieel Incassobureau (CJIB) in the Netherlands. The deal includes an eight-year operations and maintenance contract and is part of the EG100 framework agreement. Roll-out is expected to start in the first half of 2014.
  • Balfour Beatty secures contract extension to operate and maintain M1-A1 Link Road
    September 14, 2017
    Balfour Beatty, the international infrastructure group, has been awarded a US$47.5 million (£36 million) contract extension to its existing Managing Agent Contract for the M1-A1 Link Road in the UK on behalf of Connect Roads, for ultimate customer Highways England.
  • Video analytics enhances urban rail safety
    December 16, 2016
    David Crawford explores some promising innovations for North American commuters. North America is experiencing a surge in commuter rail and metro development. The US now has 75 light rail and metro networks in operation; and California, in particular, is actively exploring ways of developing the state’s existing passenger rail operations into a fully integrated system.