Skip to main content

US DOT makes funding available for positive train control implementation

The US Department of Transportation has made US$199 million in competitive grant funding for positive train control (PTC) implementation. The grants, which will be selected by the Federal Railroad Administration (FRA) and awarded and administered by the Federal Transit Administration (FTA), will help commuter railroads implement PTC, which prevents accidents and saves lives. FRA will accept applications until 5 pm EDT on 28 Sept. 28ember. Projects eligible for grants must develop information that ass
July 29, 2016 Read time: 2 mins
The 324 US Department of Transportation has made US$199 million in competitive grant funding for positive train control (PTC) implementation.  The grants, which will be selected by the Federal Railroad Administration (FRA) and awarded and administered by the Federal Transit Administration (FTA), will help commuter railroads implement PTC, which prevents accidents and saves lives.  

FRA will accept applications until 5 pm EDT on 28 Sept. 28ember.  Projects eligible for grants must develop information that assists in implementing PTC systems, such as costs of installing PTC systems; back office systems; PTC interoperability; technologies that will lower costs, accelerate implementation, enhance interoperability between host and tenant operations, and improve reliability of PTC systems; and support PTC system certification.

Eligible applicants include any entity that is eligible to receive grants from the FTA, such as commuter railroads, operators, and state and local governments.

PTC technology can prevent certain train-to-train collisions, over-speed derailments, incursions into established work zones, and trains routed to the wrong tracks because a switch was left in the wrong position.

Related Content

  • April 3, 2014
    Alaska Railroad to get Wabtec PTC
    Wabtec is to supply the Alaska Railroad Corporation with positive train control (PTC) equipment and services, including computer-aided dispatch and back office systems. The systems will be installed on the railroad's 525 miles of controlled track, which are used for both freight and regularly scheduled passenger service. Under the contracts, worth US$16.6 million, Wabtec will provide its interoperable electronic train management system (I-ETMS) equipment and installation of all PTC components for 54 loc
  • January 11, 2023
    $20m for US transit in 'economic distress'
    USDoT FTA offers grants to 'create new opportunities for those in poverty'
  • April 8, 2014
    PennDOT makes funds available for transportation improvements
    Pennsylvania Department of Transportation (PennDOT) is accepting applications for funding for transportation improvement projects under the Multimodal Transportation Fund created by Act 89. PennDOT can make available US$20 million in fiscal year 2014-15 to distribute to successful applicants. Eligible projects can cost between US$100,000 and US$3 million and they require a 30 per cent match from local sources. PennDOT will evaluate the applications and make selections based on such criteria as safety
  • December 23, 2021
    Covid turns tolls cashless
    When coronavirus hit, Pennsylvania Turnpike Commission made its long-planned e-tolling system permanent; this made sense, but it was still a difficult decision, explains the organisation’s Carl DeFebo