Skip to main content

US DOT makes funding available for positive train control implementation

The US Department of Transportation has made US$199 million in competitive grant funding for positive train control (PTC) implementation. The grants, which will be selected by the Federal Railroad Administration (FRA) and awarded and administered by the Federal Transit Administration (FTA), will help commuter railroads implement PTC, which prevents accidents and saves lives. FRA will accept applications until 5 pm EDT on 28 Sept. 28ember. Projects eligible for grants must develop information that ass
July 29, 2016 Read time: 2 mins
The 324 US Department of Transportation has made US$199 million in competitive grant funding for positive train control (PTC) implementation.  The grants, which will be selected by the Federal Railroad Administration (FRA) and awarded and administered by the Federal Transit Administration (FTA), will help commuter railroads implement PTC, which prevents accidents and saves lives.  

FRA will accept applications until 5 pm EDT on 28 Sept. 28ember.  Projects eligible for grants must develop information that assists in implementing PTC systems, such as costs of installing PTC systems; back office systems; PTC interoperability; technologies that will lower costs, accelerate implementation, enhance interoperability between host and tenant operations, and improve reliability of PTC systems; and support PTC system certification.

Eligible applicants include any entity that is eligible to receive grants from the FTA, such as commuter railroads, operators, and state and local governments.

PTC technology can prevent certain train-to-train collisions, over-speed derailments, incursions into established work zones, and trains routed to the wrong tracks because a switch was left in the wrong position.

Related Content

  • May 26, 2016
    Viaduct deck renewal creates detour dilemma for MassDOT
    As the deck renewal of the I-91 viaduct in Springfield gets underway, David Crawford looks at the preparation and planning to ease the resulting traffic congestion. Accommodating the deck renewal of a 4km-long/four-lanes in each direction viaduct in the heart of Springfield (Massachusetts’ third largest city), has involved the state’s Department of Transportation (MassDOT) in a massive exercise in transport research and ITS-based area-wide preplanning and traffic management. Supporting a workzone of well ab
  • August 31, 2021
    Microgrids & the new power generation
    Public transportation agencies are turning to microgrids to provide critical resilience in the event of local and regional power interruptions. Gordon Feller looks at projects in Maryland, New Jersey and Massachusetts
  • August 2, 2012
    Impact of US economic stimulus programme on ITS industry
    Pete Goldin reports on the public sector perspective in this second article exploring the impact of the US economic stimulus programme on the domestic ITS industry The American Recovery and Reinvestment Act (ARRA) was enacted in February 2009 to help stimulate the US economy in the face of global recession. Of measures worth a nominal total of $787 billion, the US Department of Transportation (USDOT) received just over $48 billion with which to promote short-term economic recovery and an additional $1.5 bil
  • July 17, 2012
    ITS technology reduces congestion, improves workzone safety
    As the road-building season gets under way in the US, the Federal Highway Administration has just published a White Paper which deals with the use of ITS technology in work zones. On 30 April 2009, the US Federal Highway Administration (FHWA) published a White Paper which was prepared by the US Department of Transportation (USDOT) to inform public agencies about the use of ITS to manage construction work zones. This is a particularly relevant topic given the large number of construction projects that are ex