Skip to main content

US DOT awards funding for Maryland Purple Line Project

The US Department of Transportation’s Federal Transit Administration (FTA) has announced a US$900 million federal grant agreement for the Maryland Purple Line Light Rail Project. The light rail line will make travel across Montgomery and Prince George’s counties faster and more reliable, improving access to major business and activity centres in the state’s most populated counties. The 16.2-mile Maryland Purple Line will connect major activity centres in Bethesda, Silver Spring, Takoma-Langley Park, College
August 29, 2017 Read time: 2 mins

The 324 US Department of Transportation’s 2023 Federal Transit Administration (FTA) has announced a US$900 million federal grant agreement for the Maryland Purple Line Light Rail Project. The light rail line will make travel across Montgomery and Prince George’s counties faster and more reliable, improving access to major business and activity centres in the state’s most populated counties.

The 16.2-mile Maryland Purple Line will connect major activity centres in Bethesda, Silver Spring, Takoma-Langley Park, College Park, and New Carrollton to three Washington Metropolitan Area Transit Authority rail lines, all three Maryland Area Regional Commuter (MARC) rail lines and 2008 Amtrak’s Northeast Corridor line. Although the project will provide direct connections with Metrorail and MARC, it will remain physically and operationally separate. When completed, the line will make suburb-to-suburb cross-county travel easier and faster.

The project includes the construction of 21 stations, two vehicle and maintenance storage yards with shop facilities, and the procurement of 25 articulated light-rail vehicles.

In addition to the funding from FTA’s Capital Investment Grants Program, in June 2016 US DOT announced a Transportation Infrastructure Finance and Innovation Act (TIFIA) loan of US$874.6 million to Purple Line Transit Partners for construction of the Maryland Purple Line.

Purple Line Transit Partners to design, build, finance, operate and maintain the 16.2-mile light rail system. MDOT will be the owner of the project and its selected private partner, Purple Line Transit Partners, will implement the project on a design-build-finance-operate-maintain basis.

For more information on companies in this article

Related Content

  • More Americans relying on toll roads, says report
    July 3, 2015
    A new report issued by the International Bridge, Tunnel and Turnpike Association (IBTTA) in advance of the busy Fourth of July holiday travel season indicates that as Americans take to the roads this summer they will more often choose toll roads to get them to their destinations than in years past. The report, 2015 Report on Tolling in the US, reveals that the number of trips drivers have taken on tolls roads has increased 14 per cent over the last four years, rising from 5 billion trips in 2011 to 5.7 b
  • Public transit CEOs highlight urgent need to invest in aging US public transportation systems
    May 23, 2016
    CEOs of large, mid-size and small public US transportation systems attending a press call as part of National Infrastructure Week have sounded the alarm for the urgent need to increase infrastructure investment in America's public transportation systems. The Federal Transit Administration (FTA) cited a US$86 billion backlog in deferred maintenance and replacement needs with more than 40 per cent of buses and 25 per cent of rail transit assets in marginal or poor condition, according to the latest data
  • Scania to test electric trucks and buses in real-life conditions
    June 9, 2015
    In February 2016, Scania will begin testing electric trucks as part of the Swedish Gävle Electric Road project, which will demonstrate and evaluate conductive technology, using electric transmission through overhead lines above vehicles equipped with a pantograph power collector. The Swedish Transport Administration has now approved support for the project, which is in line with the Government’s goal of an energy-efficient and fossil-free vehicle fleet by 2030. The project consists of about US$9.2 millio
  • ITS Australia says it's good to share
    June 9, 2022
    Mobility 2022 on 15-16 June in Sydney will concentrate on micromobility and active travel