Skip to main content

US DOT awards funding for Maryland Purple Line Project

The US Department of Transportation’s Federal Transit Administration (FTA) has announced a US$900 million federal grant agreement for the Maryland Purple Line Light Rail Project. The light rail line will make travel across Montgomery and Prince George’s counties faster and more reliable, improving access to major business and activity centres in the state’s most populated counties. The 16.2-mile Maryland Purple Line will connect major activity centres in Bethesda, Silver Spring, Takoma-Langley Park, College
August 29, 2017 Read time: 2 mins

The 324 US Department of Transportation’s 2023 Federal Transit Administration (FTA) has announced a US$900 million federal grant agreement for the Maryland Purple Line Light Rail Project. The light rail line will make travel across Montgomery and Prince George’s counties faster and more reliable, improving access to major business and activity centres in the state’s most populated counties.

The 16.2-mile Maryland Purple Line will connect major activity centres in Bethesda, Silver Spring, Takoma-Langley Park, College Park, and New Carrollton to three Washington Metropolitan Area Transit Authority rail lines, all three Maryland Area Regional Commuter (MARC) rail lines and 2008 Amtrak’s Northeast Corridor line. Although the project will provide direct connections with Metrorail and MARC, it will remain physically and operationally separate. When completed, the line will make suburb-to-suburb cross-county travel easier and faster.

The project includes the construction of 21 stations, two vehicle and maintenance storage yards with shop facilities, and the procurement of 25 articulated light-rail vehicles.

In addition to the funding from FTA’s Capital Investment Grants Program, in June 2016 US DOT announced a Transportation Infrastructure Finance and Innovation Act (TIFIA) loan of US$874.6 million to Purple Line Transit Partners for construction of the Maryland Purple Line.

Purple Line Transit Partners to design, build, finance, operate and maintain the 16.2-mile light rail system. MDOT will be the owner of the project and its selected private partner, Purple Line Transit Partners, will implement the project on a design-build-finance-operate-maintain basis.

For more information on companies in this article

Related Content

  • Conduent: US traffic nears pre-Covid levels
    December 18, 2020
    Toll systems see recovery in volume - but levels are still down and there is volatility   
  • ITS Australia welcomes heavy vehicle smart technology trials
    May 10, 2013
    New funding of US$1.7 million recently announced by the Federal and New South Wales Governments for trials of Cooperative Intelligent Transport Systems (C-ITS) technologies has been welcomed by Intelligent Transport Systems Australia. The Heavy Vehicle Safety and Productivity Program funds provide for pioneering projects involving heavy vehicle to infrastructure communication technologies to make roads safer.
  • Car parking and parked cars need not be a technological black hole
    March 19, 2015
    David Crawford mines the potential of joined-up parking. Drivers conventionally see parking as an isolated, often frustrating, action; but collectively their attempts to find a space impact hugely on traffic flows. But new analyses of parking events look set to deliver real benefits to motorists and cities alike. Initiatives getting under way around the world are highlighting the advantages of connecting up parking events and – eventually - parked cars. The hoped-for results include not only enhanced urban
  • Melbourne metro funding fast-tracked
    February 16, 2015
    Work has begun on one of Australia’s largest infrastructure projects: two nine-kilometre underground rail tunnels that will transform Melbourne’s public transport system. The Victoria government has fast-tracked US$31 million to establish the Melbourne Metro Rail Authority and start work on the project as soon as possible. The project also includes five new underground stations. The Authority will oversee immediate planning works, complete development of the reference design and undertake detailed site inve