Skip to main content

US DOT announces latest projects for Lo-No program

The U.S. Department of Transportation’s Federal Transit Administration (FTA) has announced the latest project selections for the Low and No-Emission Vehicle Deployment Program, known as Low-No. Seven transit providers in five states will receive a share of US$22.5 million toward transit buses and related facilities that utilise battery-electric, fuel cell and other innovative technologies to reduce harmful greenhouse gas emissions and improve operating efficiency. FTA awarded the FY 2015 funds after a hi
April 21, 2016 Read time: 2 mins
The U.S. Department of Transportation’s 2023 Federal Transit Administration (FTA) has announced the latest project selections for the Low and No-Emission Vehicle Deployment Program, known as Low-No. Seven transit providers in five states will receive a share of US$22.5 million toward transit buses and related facilities that utilise battery-electric, fuel cell and other innovative technologies to reduce harmful greenhouse gas emissions and improve operating efficiency.

FTA awarded the FY 2015 funds after a highly-competitive review process that prioritised transit agencies and bus manufacturers with strong records in building, deploying, and operating clean buses and infrastructure.

Among the projects selected in this round of Low-No funding are: The 4288 Southeastern Pennsylvania Transportation Authority (SEPTA), which will receive US$2,585,075 toward the purchase of 25 zero-emission all-electric buses and related equipment; The 1795 Los Angeles County Metropolitan Transportation Authority (LACMTA), which will receive US$4,275,000 toward five battery-electric zero-emission buses, as well as eight charging stations; The Stark Area Regional Transit Authority (SARTA) which will receive US$4,015,174 toward three zero-emission American Fuel Cell Buses (AFCBs).

The FTA’s Low or No Emission Vehicle Deployment Program was established under the Moving Ahead for Progress in the 21st Century Act (MAP-21) and re-authorised in the Fixing America’s Surface Transportation (FAST) Act.

Related Content

  • The case for tolling the Interstates
    April 20, 2012
    Speaking at an event organised by the IBTTA last week to an audience of federal and state transportation officials, policy experts, financial analysts, and representatives from engineering firms, technology companies, and transportation facility operators, Ed Regan of Wilbur Smith Associates articulated a clear case for giving states flexibility to toll existing interstate highways.
  • LA Metro extends Cubic’s service contract
    August 14, 2013
    Los Angeles County Metropolitan Transportation Authority (Metro) has awarded Cubic Transportation Systems a US$54.5 million six-year extension to its system support services contract, covering the repair and maintenance of Metro’s rail fare collection equipment, TAP validators for regional bus operators, and the back office systems. The TAP system supports six rail lines, 80 stations, and over 4,000 buses regionally. Cubic maintains and supports more than 2,000 devices under this service contract. “Our c
  • US transit agencies unite in Covid-19 response
    September 22, 2020
    Industry is also calling for another $32bn in emergency funding to keep going
  • Virginia presses ahead with tunnels upgrade despite tolls challenge
    July 30, 2013
    David Crawford reviews current developments and legal/financial issues facing tunnel management in Virginia. This autumn the Virginia Department of Transportation (VDOT) in the US will defend its plan to introduce tolling on the Elizabeth River tunnels linking the cities of Norfolk and Portsmouth in the State’s Hampton Roads area. The tolling, which is due to start from February 2014, will be examined by the State’s Supreme Court later this year. The anticipated toll income, along with loans and bonds, is