Skip to main content

Upgrade for Miami-Dade Transit metro control system

US-based B&C Transit has completed a state-of-the-art modernisation of Miami-Dade Transit's (MDT) Metrorail control system to enable MDT to streamline day-to-day operations and improve reliability of the system, while using fully customisable and long-term design solutions. B&C's Nucleus control system software was implemented to provide a single interface to view and control train control, SCADA, traction power, public address, variable message signs, scheduling, elevators, escalators, and other facilit
March 24, 2016 Read time: 2 mins
US-based B&C Transit has completed a state-of-the-art modernisation of Miami-Dade Transit's (MDT) Metrorail control system to enable MDT to streamline day-to-day operations and improve reliability of the system, while using fully customisable and long-term design solutions.

B&C's Nucleus control system software was implemented to provide a single interface to view and control train control, SCADA, traction power, public address, variable message signs, scheduling, elevators, escalators, and other facilities.  In addition, a new network and telephone system was deployed without interrupting service.

The system provides MDT with the capability to reliably communicate important information to passengers and also allows MDT to easily view and control all rail operations from a single workstation.

The B&C Nucleus software is an open-source control system that combines various subsystem interfaces into a single application which can be customised to match the look, feel, and operational requirements of each agency.

The user-friendly, point-and-click software suite allows rail traffic controllers to drill down and view specific areas of the system quickly and effortlessly; monitor alarms for all subsystems globally; track and route trains as needed; and communicate to trains, stations, and commuters via voice and visual announcements from a single control console.  

In addition, a new central video wall displays high-resolution images for closed-circuit TV, train control, traction power, and more. A section of the video wall is dedicated to provide increased security capabilities with recorded image playback, camera control, alarm monitoring and live viewing.

B&C Transit has built a specialised infrastructure with both hardware and software redundancy to ensure high availability for mission critical 24/7 operations. In addition to the redundancy at the head-end site, a disaster recovery system was also deployed at a separate location, so MDT can operate its system even if the main control building is shut down.

Related Content

  • San Francisco opts for Thales train control
    October 21, 2014
    Thales has been awarded a US$24.7 million contract by the San Francisco Municipal Transportation Agency (SFMTA) for the design and construction of advanced train control technology for the new Central Subway project, a 1.7 mile extension of the existing T Line. The company will supply its field-proven SelTrac communications based train control (CBTC) technology for the project, a solution designed to improve transit options for residents in one of the city’s most densely populated neighbourhoods, provide
  • Connected vehicles, connected systems equals next generation ITS
    July 17, 2012
    Iteris has been awarded a new contract to lead a team working to update and support the United States’ National ITS Architecture. Pete Goldin reports on this latest initiative to help all US agencies’ development and application of ITS systems The United States Department of Transportation has a set of standards safeguarded for ITS for the US, with a vision for the future of transportation technology called the National ITS Architecture. This may sound like a secret plan kept in a vault somewhere, but the
  • Teleste to implement S-aware platform on Helsinki’s metro system
    November 1, 2018
    Finnish technology company Teleste will install a ‘situational awareness’ (S-aware) platform on Helsinki’s metro system. Part of a €2 million contract to improve passenger safety, the solution will be rolled out gradually next year and is expected to be complete in 2020. S-Aware collects real-time information from various subsystems and data sources to display a real-time view of the operational infrastructure. Teleste says the system will allow Helsinki City Transport to respond better to secur
  • Virginia presses ahead with tunnels upgrade despite tolls challenge
    July 30, 2013
    David Crawford reviews current developments and legal/financial issues facing tunnel management in Virginia. This autumn the Virginia Department of Transportation (VDOT) in the US will defend its plan to introduce tolling on the Elizabeth River tunnels linking the cities of Norfolk and Portsmouth in the State’s Hampton Roads area. The tolling, which is due to start from February 2014, will be examined by the State’s Supreme Court later this year. The anticipated toll income, along with loans and bonds, is