Skip to main content

Upgrade for Miami-Dade Transit metro control system

US-based B&C Transit has completed a state-of-the-art modernisation of Miami-Dade Transit's (MDT) Metrorail control system to enable MDT to streamline day-to-day operations and improve reliability of the system, while using fully customisable and long-term design solutions. B&C's Nucleus control system software was implemented to provide a single interface to view and control train control, SCADA, traction power, public address, variable message signs, scheduling, elevators, escalators, and other facilit
March 24, 2016 Read time: 2 mins
US-based B&C Transit has completed a state-of-the-art modernisation of Miami-Dade Transit's (MDT) Metrorail control system to enable MDT to streamline day-to-day operations and improve reliability of the system, while using fully customisable and long-term design solutions.

B&C's Nucleus control system software was implemented to provide a single interface to view and control train control, SCADA, traction power, public address, variable message signs, scheduling, elevators, escalators, and other facilities.  In addition, a new network and telephone system was deployed without interrupting service.

The system provides MDT with the capability to reliably communicate important information to passengers and also allows MDT to easily view and control all rail operations from a single workstation.

The B&C Nucleus software is an open-source control system that combines various subsystem interfaces into a single application which can be customised to match the look, feel, and operational requirements of each agency.

The user-friendly, point-and-click software suite allows rail traffic controllers to drill down and view specific areas of the system quickly and effortlessly; monitor alarms for all subsystems globally; track and route trains as needed; and communicate to trains, stations, and commuters via voice and visual announcements from a single control console.  

In addition, a new central video wall displays high-resolution images for closed-circuit TV, train control, traction power, and more. A section of the video wall is dedicated to provide increased security capabilities with recorded image playback, camera control, alarm monitoring and live viewing.

B&C Transit has built a specialised infrastructure with both hardware and software redundancy to ensure high availability for mission critical 24/7 operations. In addition to the redundancy at the head-end site, a disaster recovery system was also deployed at a separate location, so MDT can operate its system even if the main control building is shut down.

Related Content

  • Green requirements of traffic video systems
    February 2, 2012
    Traficon's Head of Product and Application Management Robin Collaert offers up a discussion of the likely future green requirements of traffic video systems. At the most basic levels, ITS has the potential to significantly reduce the amounts of time which vehicles spend waiting at intersections, and less time spent waiting means less in the way of vehicular emissions. All of that will hardly come as news to most laypeople, let alone transport professionals. However, the reality is that even today too many r
  • Future of tolling: the priorities
    January 14, 2020
    In the final part of his investigation into the future of tolling technology, Josef Czako of Moving Forward Consulting asks what industry figures see as the priorities going forward…
  • Urban takes IoT Control
    April 27, 2022
    Urban Node 324 Cellular 'works straight out-of-the-box just like a smartphone'
  • Island Radar: safely crossing continents
    August 6, 2020
    There is a safety flashpoint wherever roads cross over railways. Island Radar is using well-established traffic technology to keep all parties safe from harm.