Skip to main content

Upgrade for Miami-Dade Transit metro control system

US-based B&C Transit has completed a state-of-the-art modernisation of Miami-Dade Transit's (MDT) Metrorail control system to enable MDT to streamline day-to-day operations and improve reliability of the system, while using fully customisable and long-term design solutions. B&C's Nucleus control system software was implemented to provide a single interface to view and control train control, SCADA, traction power, public address, variable message signs, scheduling, elevators, escalators, and other facilit
March 24, 2016 Read time: 2 mins
US-based B&C Transit has completed a state-of-the-art modernisation of Miami-Dade Transit's (MDT) Metrorail control system to enable MDT to streamline day-to-day operations and improve reliability of the system, while using fully customisable and long-term design solutions.

B&C's Nucleus control system software was implemented to provide a single interface to view and control train control, SCADA, traction power, public address, variable message signs, scheduling, elevators, escalators, and other facilities.  In addition, a new network and telephone system was deployed without interrupting service.

The system provides MDT with the capability to reliably communicate important information to passengers and also allows MDT to easily view and control all rail operations from a single workstation.

The B&C Nucleus software is an open-source control system that combines various subsystem interfaces into a single application which can be customised to match the look, feel, and operational requirements of each agency.

The user-friendly, point-and-click software suite allows rail traffic controllers to drill down and view specific areas of the system quickly and effortlessly; monitor alarms for all subsystems globally; track and route trains as needed; and communicate to trains, stations, and commuters via voice and visual announcements from a single control console.  

In addition, a new central video wall displays high-resolution images for closed-circuit TV, train control, traction power, and more. A section of the video wall is dedicated to provide increased security capabilities with recorded image playback, camera control, alarm monitoring and live viewing.

B&C Transit has built a specialised infrastructure with both hardware and software redundancy to ensure high availability for mission critical 24/7 operations. In addition to the redundancy at the head-end site, a disaster recovery system was also deployed at a separate location, so MDT can operate its system even if the main control building is shut down.

Related Content

  • AMG injects power into US PoE market
    April 25, 2023
    The need for higher wattage PoE continues to drive innovation throughout the industry. To this end, AMG Systems has introduced the AMG 150 series of PoE power injectors for Power over Ethernet applications requiring up to 90 Watts of operating power.
  • Spokane Transit Authority expands public transport system
    January 10, 2013
    Public transport passengers in Spokane, Washington, US, are to get real time transit information both on and off the vehicle. Passenger transport systems provider Trapeze Group is to extend the current Spokane Transit Authority (STA) Trapeze transit enterprise system to include a comprehensive intelligent transportation system to help them better manage their fixed-route bus service and provide passengers with real time transit information. The Trapeze solution for STA includes computer-aided dispatch and
  • Centralised remote control in ports opens endless digitisation possibilities
    August 5, 2021
    Port Intelligent Twins speed up upgrades in the port & shipping industry
  • Alstom and Huawei complete first LTE 4G pilot for metros
    July 6, 2015
    Alstom and Huawei have successfully completed a pilot project to develop a Long Term Evolution (LTE) 4G multi-service broadband radio networking technology for metros. The project was launched in the frame of a Memorandum of Understanding in April 2014, under which Huawei supplied the LTE network and Alstom which provided the train set and onboard signalling equipment. Alstom claims to be the first rail manufacturer to integrate LTE 4G in its signalling solution. LTE technology enables a single wirele