Skip to main content

Upgrade for Miami-Dade Transit metro control system

US-based B&C Transit has completed a state-of-the-art modernisation of Miami-Dade Transit's (MDT) Metrorail control system to enable MDT to streamline day-to-day operations and improve reliability of the system, while using fully customisable and long-term design solutions. B&C's Nucleus control system software was implemented to provide a single interface to view and control train control, SCADA, traction power, public address, variable message signs, scheduling, elevators, escalators, and other facilit
March 24, 2016 Read time: 2 mins
US-based B&C Transit has completed a state-of-the-art modernisation of Miami-Dade Transit's (MDT) Metrorail control system to enable MDT to streamline day-to-day operations and improve reliability of the system, while using fully customisable and long-term design solutions.

B&C's Nucleus control system software was implemented to provide a single interface to view and control train control, SCADA, traction power, public address, variable message signs, scheduling, elevators, escalators, and other facilities.  In addition, a new network and telephone system was deployed without interrupting service.

The system provides MDT with the capability to reliably communicate important information to passengers and also allows MDT to easily view and control all rail operations from a single workstation.

The B&C Nucleus software is an open-source control system that combines various subsystem interfaces into a single application which can be customised to match the look, feel, and operational requirements of each agency.

The user-friendly, point-and-click software suite allows rail traffic controllers to drill down and view specific areas of the system quickly and effortlessly; monitor alarms for all subsystems globally; track and route trains as needed; and communicate to trains, stations, and commuters via voice and visual announcements from a single control console.  

In addition, a new central video wall displays high-resolution images for closed-circuit TV, train control, traction power, and more. A section of the video wall is dedicated to provide increased security capabilities with recorded image playback, camera control, alarm monitoring and live viewing.

B&C Transit has built a specialised infrastructure with both hardware and software redundancy to ensure high availability for mission critical 24/7 operations. In addition to the redundancy at the head-end site, a disaster recovery system was also deployed at a separate location, so MDT can operate its system even if the main control building is shut down.

Related Content

  • June 11, 2015
    Machine vision’s image of road management’s future
    Q-Free’s Marco Sinnema looks at how the commoditisation of high-quality vision-based solutions is widening their application. Machine vision technology’s entry into the ITS/traffic management sector has followed a classic top-down path. This is unsurprising given the extremely demanding performance criteria which are the standard in its market of origin, manufacturing processing. Very high image qualities combined with frame rates often in the hundreds per second range resulted in vision systems with capabi
  • May 2, 2018
    Running on empty
    Drivers are an increasingly rare species on Europe’s commuter metros as unattended train operation is embraced. David Crawford takes a low-speed tour of the continent’s capitals to see what’s happening. Unattended train operation (UTO) is fast becoming the norm for Europe’s metros, on existing as well as new lines. November 2017 statistics published by the International Association of Public Transport (UITP) show the continent as having 28% of the global total of route km on lines operating at the ultimate
  • January 4, 2022
    Teledyne Flir: here’s how to find the right ITS camera
    From lighting to weather, there are so many elements which need to be taken into account when choosing a camera for ITS operations. Riana Sartori from Teledyne Flir offers a buyer’s guide
  • June 12, 2015
    Temporary CCTV poses more challenges than permanent installations
    Long-term roadworks pose particular problems for temporary surveillance installations. Converting the hard shoulder to a running lane, either full- or part-time, is the UK Highways Agency’s solution to ease motorway congestion. This is leading to a number of long-term projects where large stretches of the hard shoulder are closed off by temporary concrete barriers and during these roadwork programmes, temporary CCTV cameras are deployed to monitor and record vehicle traffic and workers.