Skip to main content

Upgrade for Miami-Dade Transit metro control system

US-based B&C Transit has completed a state-of-the-art modernisation of Miami-Dade Transit's (MDT) Metrorail control system to enable MDT to streamline day-to-day operations and improve reliability of the system, while using fully customisable and long-term design solutions. B&C's Nucleus control system software was implemented to provide a single interface to view and control train control, SCADA, traction power, public address, variable message signs, scheduling, elevators, escalators, and other facilit
March 24, 2016 Read time: 2 mins
US-based B&C Transit has completed a state-of-the-art modernisation of Miami-Dade Transit's (MDT) Metrorail control system to enable MDT to streamline day-to-day operations and improve reliability of the system, while using fully customisable and long-term design solutions.

B&C's Nucleus control system software was implemented to provide a single interface to view and control train control, SCADA, traction power, public address, variable message signs, scheduling, elevators, escalators, and other facilities.  In addition, a new network and telephone system was deployed without interrupting service.

The system provides MDT with the capability to reliably communicate important information to passengers and also allows MDT to easily view and control all rail operations from a single workstation.

The B&C Nucleus software is an open-source control system that combines various subsystem interfaces into a single application which can be customised to match the look, feel, and operational requirements of each agency.

The user-friendly, point-and-click software suite allows rail traffic controllers to drill down and view specific areas of the system quickly and effortlessly; monitor alarms for all subsystems globally; track and route trains as needed; and communicate to trains, stations, and commuters via voice and visual announcements from a single control console.  

In addition, a new central video wall displays high-resolution images for closed-circuit TV, train control, traction power, and more. A section of the video wall is dedicated to provide increased security capabilities with recorded image playback, camera control, alarm monitoring and live viewing.

B&C Transit has built a specialised infrastructure with both hardware and software redundancy to ensure high availability for mission critical 24/7 operations. In addition to the redundancy at the head-end site, a disaster recovery system was also deployed at a separate location, so MDT can operate its system even if the main control building is shut down.

Related Content

  • Arup’s vision of urban mobility in 2050
    May 6, 2015
    Arup’s vision of the Future of Highways considers a wide range of factors that will impact on mobility towards the middle of the century. In its consideration of the Future of Highways through to 2050, international consultants Arup has taken a broad and pragmatic view of where society is heading and the effects that will have on the transport requirements. In terms of major drivers it not only cites
  • Success of Kuala Lumpur's dual purpose tunnel
    September 12, 2012
    Malaysia’s capital boasts a unique piece of infrastructure; a combined stormwater and motorway tunnel, the longest multi-purpose tunnel in the world. Kuala Lumpur’s Stormwater Management and Road Tunnel (Smart) was conceived as a project under the Malaysian Federal Government to alleviate the flooding problem in the city centre. Although a booming city and the nerve centre for Malaysia’s economy, KL was built along the flood plains of the Klang River and, since its earliest days has been subjected to floodi
  • Narrow bezel monitors
    January 23, 2012
    Pelco has expanded its line of viewing solutions to include new narrow bezel LCD monitors. With full high-definition 1,920x1,080p resolution and edges that range from just 9.6 mm to 17.4 mm, these monitors can be tiled together to create a virtually seamless video wall.
  • Indra upgrades ticketing in Chile 
    March 16, 2022
    Indra is to deploy new ticket validators modelled after those installed on the bus network