Skip to main content

University of Birmingham’s sensor wins Intelligent Infrastructure Challenge

University of Birmingham’s road surface temperature sensor which uses infrared thermometry will be adopted on the UK’s road and motorway network following a national award at the Highways UK Intelligent Infrastructure Challenge 2017. The judges at the ceremony believe that deploying the sensor network could have an immediate impact on their ability to better control gritting routines in winter. Developed by Lee Chapman, professor of Climate Resilience at the University, the Wintersense sensors are
November 24, 2017 Read time: 2 mins
University of Birmingham’s road surface temperature sensor which uses infrared thermometry will be adopted on the UK’s road and motorway network following a national award at the Highways UK Intelligent Infrastructure Challenge 2017. The judges at the ceremony believe that deploying the sensor network could have an immediate impact on their ability to better control gritting routines in winter. 

Developed by Lee Chapman, professor of Climate Resilience at the University, the Wintersense sensors are Internet of Things enabled and use low power communications which aim to provide a real-time measurement of road surface temperature that will be used to direct gritting lorries to priority areas.

The panel of judges included representatives from Highways England, Transport Scotland, England’s Economic Heartland and Transport for the North.

During the winter months, highways maintenance companies dispatch fleets of gritting lorries which aim to present or mitigate the impact of black ice formation on motorways and A roads. In harsh winters, the routing of gritting lorries is prioritised to ensure optimal road safety. 

Lee Chapman, said: “The key issue in this prioritisation is having good spatial resolution on observation of road surface conditions.  Our sensors are an order of magnitude cheaper than existing solutions, and light enough to be mounted on any lamp post, gantry or road sign, which means a dense network of sensors can be rapidly deployed along a road network to provide a highly granular picture of road surface conditions.” 

Related Content

  • Wellington City Council chooses Telensa’s Smart Light System
    November 28, 2017
    Telensa has been selected by Wellington City Council in the UK to deploy its intelligent streetlighting system which according to the company pays for itself in reduced energy maintenance costs. The project will start in November 2017 and is due for completion in June next year. The Telena Planet is an end-to-end system that consists of wireless nodes connecting individual lights, a dedicated wireless network owned by the city, and a central management application. It aims to improve quality of service
  • Wellington City Council chooses Telensa Smart Light System
    November 28, 2017
    Telensa has been selected by Wellington City Council in the UK to deploy its intelligent streetlighting system which according to the company pays for itself in reduced energy maintenance costs. The project will start in November 2017 and is due for completion in June next year. The Telena Planet is an end-to-end system that consists of wireless nodes connecting individual lights, a dedicated wireless network owned by the city, and a central management application. It aims to improve quality of service
  • AWS Innovation Competition nears climax
    December 9, 2021
    The ITS America 2021 Annual Meeting Innovation competition, sponsored by Amazon Web Services (AWS) will reach its climax today with the selection of the winners from the 11 finalists.
  • Interoperability: towards the new frontier
    October 22, 2018
    After six years of intensive research, testing and negotiation, the US tolling industry is well on its way to groundbreaking results in the effort to establish regional - and eventually national - toll interoperability, says IBTTA’s Bill Cramer. Interoperability has been a high priority on the US tolling industry’s agenda for more than a decade. But several factors made it a uniquely complex issue to resolve - including the number of agencies involved, the significant investments those agencies had already