Skip to main content

UK university unveils technology to solve 200-year old railway problem

A failsafe track switch designed to eradicate a 200-year-old problem on the railway has been created by engineers at Loughborough University in the UK. The technology, known as Repoint, is a robust and reliable points mechanism which will improve safety, reduce maintenance costs and boost capacity on the railways.
September 10, 2015 Read time: 2 mins
A failsafe track switch designed to eradicate a 200-year-old problem on the railway has been created by engineers at Loughborough University in the UK.

The technology, known as Repoint, is a robust and reliable points mechanism which will improve safety, reduce maintenance costs and boost capacity on the railways.

Supported by the UK Rail Safety and Standards Board (RSSB), Repoint is the result of work carried out with industry experts into improved switches to override track switch failures which can lead to train derailment.

Using safety concepts derived from aerospace and the nuclear industry, Repoint corrects a failed switch through a patented arrangement of interlocking rail ends which incorporate a sliding arrangement similar to a breather switch. A lift and drop mechanism allows for expansion and provides an additional locking mechanism with virtually no friction losses.

The mechanism can also move the switch in fractions of a second compared to the current four seconds for conventional designs, during which time a train may have travelled a distance of 200 metres. The university claims that Repoint’s ability to reduce this time to under a second improves rail capacity without the need to build new infrastructure.

Professor Roger Dixon, head of the Control Systems Research Group, said the next step was to build a prototype switch to be trialled in a non-passenger environment either on a test track or a siding.

“Repoint is a robust alternative to conventional switches that breaks with 200 years of tradition to offer a change in design that is inherently failsafe and fit for a 21st century rail network,” he said. “It also has the potential to deliver huge cost savings, and will result in a significant increase in reliability and safety to the rail industry worldwide.

“We are currently seeking development partners from around the world to work with us to roll out the patented technology across international rail networks.”

Related Content

  • How safe are smart motorways?
    March 3, 2020
    A valiant attempt to ease the UK’s congested strategic road system? Or an idea that should never have seen the light of day? Alan Dron reports on the controversy over smart motorways...
  • Travel times halve for tolling converts
    August 5, 2013
    The Port Mann Bridge in Vancouver is a prime example of how the latest ITS systems enable new infrastructures to be built and paid for while still providing additional user benefits. Vancouver has 2.2 million inhabitants and, like so many major cities, is divided into two by a river, the Frazer river. This combination makes Vancouver the second most congested city in North America and the most congested in Canada. Through the middle of the city runs the Trans-Canadian Highway 1 which crosses the Frazer Riv
  • Prime Minister’s ‘roads revolution’ good news for industry
    November 11, 2014
    Responding to the UK Prime Minister’s announcement which outlined a ‘roads revolution,’ the Freight Transport Association (FTA) has said that plans to deliver roads improvements across the country are good news for the freight and logistics industry. David Cameron stated that plans for the biggest road building programme for almost half a century will be unveiled in next month's Autumn Statement and would contain a US$24 billion overhaul of 100 of Britain's busiest roads and motorways by the end of the
  • Rail industry, regulators debate feasibility of PTC
    March 10, 2014
    US rail industry officials and federal accident regulators have disagreed about the viability of a looming mandate that most US railways be equipped with automated control systems by the end of next year. Congress is requiring that most major railroad companies install automated systems known as positive train control (PTC) by December 2015. Automated train systems have gained renewed attention after a spate of high-profile accidents on passenger and freight railways, including most recently a Decem