Skip to main content

UK university unveils technology to solve 200-year old railway problem

A failsafe track switch designed to eradicate a 200-year-old problem on the railway has been created by engineers at Loughborough University in the UK. The technology, known as Repoint, is a robust and reliable points mechanism which will improve safety, reduce maintenance costs and boost capacity on the railways.
September 10, 2015 Read time: 2 mins
A failsafe track switch designed to eradicate a 200-year-old problem on the railway has been created by engineers at Loughborough University in the UK.

The technology, known as Repoint, is a robust and reliable points mechanism which will improve safety, reduce maintenance costs and boost capacity on the railways.

Supported by the UK Rail Safety and Standards Board (RSSB), Repoint is the result of work carried out with industry experts into improved switches to override track switch failures which can lead to train derailment.

Using safety concepts derived from aerospace and the nuclear industry, Repoint corrects a failed switch through a patented arrangement of interlocking rail ends which incorporate a sliding arrangement similar to a breather switch. A lift and drop mechanism allows for expansion and provides an additional locking mechanism with virtually no friction losses.

The mechanism can also move the switch in fractions of a second compared to the current four seconds for conventional designs, during which time a train may have travelled a distance of 200 metres. The university claims that Repoint’s ability to reduce this time to under a second improves rail capacity without the need to build new infrastructure.

Professor Roger Dixon, head of the Control Systems Research Group, said the next step was to build a prototype switch to be trialled in a non-passenger environment either on a test track or a siding.

“Repoint is a robust alternative to conventional switches that breaks with 200 years of tradition to offer a change in design that is inherently failsafe and fit for a 21st century rail network,” he said. “It also has the potential to deliver huge cost savings, and will result in a significant increase in reliability and safety to the rail industry worldwide.

“We are currently seeking development partners from around the world to work with us to roll out the patented technology across international rail networks.”

Related Content

  • Autonomous vehicles, the pros and cons
    November 21, 2013
    Driver interface and human factors could provide the biggest obstacles to autonomous vehicles as Jon Masters discovers.
  • Telvent relocates and takes a global stance on ITS
    March 12, 2012
    Telvent's Manuel Sanchez Ortega, on relocating the company's headquarters to the US and how that fits in the international scheme of things. The change-of-address cards are in the post; Manuel Sanchez Ortega has just moved homes. The domestic upheaval of Telvent's Chairman and Chief Executive comes as a result of the decision to relocate many of the company's headquarter functions from Madrid to Rockville, Maryland in the US. Viewed in the context of its significant recent acquisitions in North America - am
  • Coded exchanges
    July 24, 2012
    For many, Ethernet- and IP-based networks are the cast-iron solution to ITS's communications needs. However, there remain issues from manufacturer to manufacturer with interpretation of what are supposed to be common standards The 'promise' of Ethernet was that different devices such as IP video cameras and traffic signals could be easily integrated into communications networks, simplifying the process of transporting data over copper, fibre or wirelessly. However, although Ethernet devices have come to pre
  • Milestone for Northern Powerhouse as UK’s first tram train unveiled
    December 14, 2015
    The UK's first ever tram train has been unveiled in South Yorkshire. Vehicles from this government-funded project are designed to run on both the city’s tramlines and the rail network between Sheffield and Rotherham. This will allow passengers to make single journey between tram stops and conventional rail stations from early 2017, once the works are complete. Prior to this, the tram trains will undergo a period of testing, before being introduced on the Supertram network in summer 2016, to provide extra