Skip to main content

UK government to fund carbon-cutting truck trials

Truck operators have been invited to apply for a slice of US$15.34 million provided for industry trials of carbon-cutting trucks by the UK Department for Transport and the Technology Strategy Board. A competition opened yesterday for applications under the ‘Low carbon truck demonstration trial’ which will deliver fleets of low-emission heavy goods vehicles as well as supporting infrastructure such as fuelling stations and electric recharging hubs.
April 25, 2012 Read time: 2 mins
RSSTruck operators have been invited to apply for a slice of US$15.34 million provided for industry trials of carbon-cutting trucks by the UK 1837 Department for Transport and the 2231 Technology Strategy Board. A competition opened yesterday for applications under the ‘Low carbon truck demonstration trial’ which will deliver fleets of low-emission heavy goods vehicles as well as supporting infrastructure such as fuelling stations and electric recharging hubs.

“Almost a quarter of carbon from transport in this country comes from heavy goods vehicles, so this is a key area for us to tackle,” said transport minister Mike Penning. “These trials will show us how low-carbon technologies perform day-to-day in the real world, providing vital data to build operator confidence in these green trucks and allowing us to make policy choices based on hard evidence.

“The investment in gas refuelling infrastructure will also give haulage firms a push to buy gas-powered HGVs, leaving a legacy that will support low-carbon transport well into the future,” Penning said.

Companies wishing to take advantage of the funding have until 20 June to bid for up to US$1.2 million each. Trials will run for two years and data collected over this period will be used to inform Government policy on low-carbon road freight. To qualify for the competition, vehicles must deliver carbon savings of at least 15 per cent compared with the equivalent conventional vehicle. A variety of technologies are eligible for funding under the rules of the competition including gas-powered, dual fuel or hybrid trucks of over 7.5 tonnes and electric vehicles over 3.5 tonnes.

Details of the competition can be found online here.

For more information on companies in this article

Related Content

  • ODoT targets transportation funding solutions and alternatives
    March 22, 2012
    Jerry Wray, Ohio Department of Transportation (ODoT) director, has officially announced the Division of Innovative Delivery, a move he says is critical to identifying innovative and alternative funding solutions and advancing the agency’s goal developing long-term, sustainable solutions to fund future transportation construction projects. By reducing agency costs, commercialising non-interstate rest areas and seeking sponsorship and naming rights for certain infrastructure projects, the Ohio Department of T
  • All electric vehicle barrier exceeds cycle testing expectations
    March 23, 2012
    "The cycle testing was performed at the Texas Transportation Institute at the Texas A&M University System, in College Station, Texas. The IIID electric barrier successfully completed 1,491,455 cycles, before a replaceable cable failed.
  • FTA demands no more delay in new Thames Crossing
    December 13, 2013
    Responding to the yesterday’s announcement that there is still no definitive answer to the location of the new Thames Crossing, the message from the Freight Transport Association (FTA) was “don’t delay and let the building begin to help improve capacity and ease congestion at Dartford as soon as possible”. The Government has stated that Option B connecting the A2 Swanscombe Peninsula with the A1089 has been ruled out of the process, but has failed to confirm as to where the new Lower Thames crossing wil
  • First electric car ferry goes into operation in Norway
    May 19, 2015
    The world’s first electrical car and passenger ferry powered by batteries has entered service in Norway. The unique solution is a result of a competition that Ministry of Transport and Communications and the Norwegian Public Roads Administration launched in 2010. The ferry only uses 150 kWh per route, which corresponds to three days use of electricity in a standard Norwegian household. Built in conjunction with shipbuilder Fjellstrand, Siemens installed the complete electric propulsion system and install