Skip to main content

UK digital Railway contracts awarded

WSP/Parsons Brinckerhoff has been appointed by the UK’s Network Rail to provide design and engineering services on the Digital Railway’s Multi-Functional Design Framework (MFD). The digital railway is a government supported, industry-wide programme aimed at increasing the role of digital technologies to improve capacity, connectivity and reliability. Through the framework WSP/Parsons Brinckerhoff will provide a range of strategic engineering and project management services to support the delivery of the
June 21, 2016 Read time: 2 mins
6666 WSP/4983 Parsons Brinckerhoff has been appointed by the UK’s Network Rail to provide design and engineering services on the Digital Railway’s Multi-Functional Design Framework (MFD). The digital railway is a government supported, industry-wide programme aimed at increasing the role of digital technologies to improve capacity, connectivity and reliability.

Through the framework WSP/Parsons Brinckerhoff will provide a range of strategic engineering and project management services to support the delivery of the European Rail Traffic Management Systems (ERTMS) on the UK’s railways. ERTMS is the digital equivalent of the traditional signalling system, which removes fixed-blocks and in turn the need for trains to stop and start at red lights. This improves capacity and provides greater reliability and enables other digital applications including automatic train operation, advanced passenger information, real time train planning and electronic ticketing.

As part of its contract, the company has appointed UK systems and engineering technology company Frazer-Nash to support its work on the programme.

Frazer Nash will be providing a range of strategic engineering services and will work on the development of the security case for the Digital, utilising its skills in rail systems engineering, systems assurance, hazard management, auditing and cyber security and assurance.

Related Content

  • June 2, 2016
    Michigan DOT awards WSP/Parsons Brinckerhoff CV contracts
    The Michigan Department of Transportation (MDOT) has awarded two contracts to WSP/ Parsons Brinckerhoff for the development of connected vehicle initiatives throughout the state. The company will act as on-call consultant for MDOT’s state-wide connected vehicle program for a period of three years, providing such services as planning and strategy development, design and deployment of foundational system elements, public outreach and progress reporting and development of industry partnerships. In additi
  • December 20, 2024
    Huawei addresses congested, separated rail networks with cloud solution
    A shift to a cloud-based operating regime solves the problems of trying to make cluttered, geographically-discrete terrestrial systems work together
  • July 31, 2012
    Dubai metro - the world's longest automated rail system
    David Crawford reviews the recent opening of Dubai's Red Line. The US$7.6bn Dubai Metro, the Phase I Red Line of which started partial operation in September 2009, will be the world's longest driverless rail system on its planned completion in 2011. With a total length of some 75km, it will then overtake the 68.7km Vancouver SkyTrain and be able to carry over 1.2 million passengers on a typical day.
  • October 3, 2016
    WSP/Parsons Brinckerhoff announces latest senior hires
    WSP/Parsons Brinckerhoff has appointed three technical directors to its team. Carol Stitchman joins as rail technical director from Network Rail, based in Birmingham. As part of her new role, and as a member of the UK rail stations management team, Carol will strengthen the consultancy’s expertise in delivering major stations work including high speed rail. In May 2016, Carol won both the Best Woman Architect and the Most Distinguished Winner of 2016 at the European Women in Construction & Engineer