Skip to main content

UK council upgrades street lighting maintenance

Peterborough City Council’s ambitious plans to minimise maintenance costs will be aided by street lighting asset management software from Mayrise Systems which will also work in tandem with the UK council’s central management system. Mayrise Street lighting is a complete asset management system designed to simplify and improve the management of asset records. It provides fast online access to inventory, contractor and customer records and incorporates instant mapping to pinpoint asset or fault locations. Ha
August 14, 2013 Read time: 2 mins
Peterborough City Council’s ambitious plans to minimise maintenance costs will be aided by street lighting asset management software from 188 Mayrise Systems which will also work in tandem with the UK council’s central management system.
 
Mayrise Street lighting is a complete asset management system designed to simplify and improve the management of asset records. It provides fast online access to inventory, contractor and customer records and incorporates instant mapping to pinpoint asset or fault locations. Handling cyclic maintenance, fault management, electrical testing and financial control. Mayrise street lighting also links to corporate GIS and portable computers for field data entry and mapping.

The asset database links to the council’s Telensa system which allows for the remote control and monitoring of lighting units. Wireless technology lighting units are fitted with a small radio aerial. The unit transmits information, such as energy consumption, burning hours, temperature and mains supply voltage, and can also be used to determine if a lamp has failed. Operating times can be controlled and the lighting level of the unit varied in those devices that have a dimming module installed.

“The installation of the Mayrise street lighting system has helped us to create and maintain a detailed street lighting inventory which has been integral to our improvement plans,” commented Sally Savage, a senior officer at Peterborough City Council. “The Mayrise system integrates with our remote control and monitoring system and our maintenance contractors can access the system remotely.” 

For more information on companies in this article

Related Content

  • Finnish transport agency (Liikennevirasto) selects Vilant GEN2 RFID system
    June 19, 2012
    Liikennevirasto, the body responsible for the management, development and maintenance of the Finnish railway network, has announced Europe's largest train identification system with passive RFID covering the whole of Finnish state rail network. Vilant has won a contract to install 120 specialised RFID reader units, and integrate them into Liikennevirasto's detector network.
  • GMV system upgrades Cyprus's buses to improve traffic conditions
    December 22, 2017
    Cyprus's Transport and communications minister, Marios Demetriadis, travelled onboard one of the country's modernized buses fitted with GMV's fleet-management system to provide riders with real-time, bus stop and status information and improve the region's public transport services. This equipment has been installed in two-thirds of the 790 vehicles and will include fleets from Nicosia and Limassol in December.
  • Utah Department of Transportation: How we’re using traffic analytics software
    February 4, 2025
    Our use of Iteris ClearGuide lets our traffic operations engineers interpret critical probe traffic data without the need for statisticians and software developers
  • Swarco signs aid peak time traffic flow on residential streets
    January 26, 2016
    The London Borough of Camden has installed two Swarco Prism signs at either end of a width-restricted road in a bid to curb drivers using the road to avoid congestion during peak periods. The signs are timed to change at peak periods of day to create a short one-way section and ease traffic flow. Outside these hours, priority working signs manage the narrow stretch of road. The signs include integrated PC controls, which enable operators to remotely control and alter the timing of the switchover as req