Skip to main content

UK city to create rapid transit bus network

Procurement has begun on a US$305 million programme for a bus rapid transit (BRT) network in the Greater Bristol area of England, with construction anticipated to be underway by 2014. The network, which will connect commuter areas of North Somerset and South Gloucestershire, will offer a much improved public transport service to the Greater Bristol area. The three schemes that make up the BRT network are at different stages of design prior to build, providing a number of opportunities for contractors. West
July 9, 2012 Read time: 2 mins
Procurement has begun on a US$305 million programme for a bus rapid transit (BRT) network in the Greater Bristol area of England, with construction anticipated to be underway by 2014.

The network, which will connect commuter areas of North Somerset and South Gloucestershire, will offer a much improved public transport service to the Greater Bristol area. The three schemes that make up the BRT network are at different stages of design prior to build, providing a number of opportunities for contractors. West of England has developed a joint procurement strategy with the help of UK engineering consultants WSP to ensure procurement and operational activities are joined up across all the local authorities involved.

The procurement routes include seven design and build contracts covering the guided busway and key structures, as well as an overall design and build for the South Bristol Link. All tenders and notices for North Fringe to Hengrove Package and the Ashton Vale to Temple Meads route will be made available on the Bristol City Council website. The Official Journal of the European Union (OJEU) notification for the seven design and build contracts is underway.

Related Content

  • September 16, 2014
    Major funding announced to improve Bristol’s public transport
    A new rapid bus network for Bristol will be built after the UK Department for Transport announced US$55 million funding towards the US$73 million total cost of the project. The aim is to provide better bus connections between key areas of employment, housing, retail and leisure. The network will tackle traffic congestion, help create regeneration and support new jobs and homes. The Metrobus is intended to encourage car drivers coming into Bristol to shift onto public transport. Existing bus services i
  • February 5, 2016
    UK government funds connected vehicle development with a Flourish
    The UK government has selected the Flourish consortium as a winner of its multi-million pound research grant to fuel development in user-centric autonomous vehicle technology and connected transport systems. The new programme, co-funded by the UK’s innovation agency, Innovate UK, will focus on the core themes of connectivity, autonomy and customer interaction. The three-year project, led by Atkins and worth US$8 million, seeks to develop products and services that maximise the benefits of connected and
  • September 19, 2023
    UK local roads decarbonisation programme gets £4.5m
    UK Department for Transport and Adept have allocated cash for Centre of Excellence
  • May 26, 2016
    Viaduct deck renewal creates detour dilemma for MassDOT
    As the deck renewal of the I-91 viaduct in Springfield gets underway, David Crawford looks at the preparation and planning to ease the resulting traffic congestion. Accommodating the deck renewal of a 4km-long/four-lanes in each direction viaduct in the heart of Springfield (Massachusetts’ third largest city), has involved the state’s Department of Transportation (MassDOT) in a massive exercise in transport research and ITS-based area-wide preplanning and traffic management. Supporting a workzone of well ab