In addition, the integrated supervision solution is intended to improve operational efficiency by providing high-level automated control.
Line 14 will cross the downtown area from east to west, with a total length of 38.5 km and 31 underground stations that will be connected to at least 13 other lines in the network. The FAO demonstration’s fully redundant system architecture provides high availability and is said to ensure that a signalling failure has zero operational impact.