Skip to main content

TST awarded signalling contract for shanghai automated metro line

Shanghai Shentong Metro Group has awarded Thales SEC Transport the signalling contract for the Fully Automated Operation (FAO) Line 14 of the City’s Metro. It will provide an integrated management system as well as signalling and supervision solutions with the intention of meeting the demand for metro transport capacity and alleviating traffic in the downtown area. The driverless and highly automated line is scheduled to enter service at the end of 2020.
January 30, 2018 Read time: 1 min
Shanghai Shentong Metro Group has awarded 596 Thales SEC Transport the signalling contract for the Fully Automated Operation (FAO) Line 14 of the City’s Metro. It will provide an integrated management system as well as signalling and supervision solutions with the intention of meeting the demand for metro transport capacity and alleviating traffic in the downtown area. The driverless and highly automated line is scheduled to enter service at the end of 2020.


In addition, the integrated supervision solution is intended to improve operational efficiency by providing high-level automated control.

Line 14 will cross the downtown area from east to west, with a total length of 38.5 km and 31 underground stations that will be connected to at least 13 other lines in the network. The FAO demonstration’s fully redundant system architecture provides high availability and is said to ensure that a signalling failure has zero operational impact.

Related Content

  • April 17, 2012
    Thales delivers ATO system for the Mecca metro
    Thales has opened the last phase of Mecca’s new 18.5 km metro line on schedule and in time for the Hajj pilgrimage, the world’s largest religious gathering. The line transports pilgrims between holy sites, reducing travel time between Arafat and Muzdalifah from five hours to just ten minutes.
  • January 9, 2019
    Keolis Shanghai opens first section of Songjiang tram line
    Keolis Shanghai, a joint venture with Shanghai Shentong Metro, has opened the first section of the Songjiang tram line, offering connections to Shanghai Metro Line 6. The first phase is expected to transport 170,00 passengers per day. The 13.9km route runs across Songjiang, a suburban district, and includes 20 stations from Canghua Rd station in the west to Zhongchen Rd station in the east which serves residential areas and universities. The service is being operated with 15 Citadis trams manufacture
  • April 2, 2013
    Thales transport systems for Santo Domingo metro
    Thales, as a member of the Eurodom consortium, has supplied communication, supervision, signalling and ticketing systems for line 2 of the Santo Domingo Metro in the Dominican Republic. The opening of the metro line, which crosses the city from east to west, is a key milestone in a national plan to improve public transport and relieve congestion on the road network. It connects to the north-south line 1 and once complete, will run for 21 km and will have twenty stations. Fourteen stations are now open and t
  • September 5, 2013
    Thales scoops Hong Kong signalling contract
    Thales has been awarded a contract by Hong Kong’s metro operator, MTR Corporation, to provide signalling technology for Shatin to Central Link Phase 1 segment of the Hong Kong metro using a communications-based train control (CBTC) system. To provide fully automatic train operation the contract includes the modernisation of the Ma On Shan Line and West Rail Line lines, where Thales previously installed its CBTC solution in 2003/04.