Skip to main content

TRL aids Highways Agency with M2 motorway hole investigation

The UK’s transport research Laboratory (TRL) provided a rapid response when asked for help as part of the investigation of the recent appearance of a hole in the central reservation of the M2 between junctions 5 near Sittingbourne and 6, near Faversham. The hole that appeared is believed to be a dene hole; an historic man made hole which may have been used to mine for chalk hundreds of years ago. The hole was filled in when the M2 was constructed, but recent wet weather contributed to the destabilisati
February 21, 2014 Read time: 2 mins
The UK’s transport research Laboratory (491 TRL) provided a rapid response when asked for help as part of the investigation of the recent appearance of a hole in the central reservation of the M2 between junctions 5 near Sittingbourne and 6, near Faversham.  

The hole that appeared is believed to be a dene hole; an historic man made hole which may have been used to mine for chalk hundreds of years ago. The hole was filled in when the M2 was constructed, but recent wet weather contributed to the destabilisation of the ground, causing the hole to appear.

Within a few hours of being asked for assistance, TRL was able to mobilise a team to be on site to provide two coring rigs and staff to undertake investigations of the carriageway in one lane either side of the hole to establish its integrity. The carriageway is constructed of jointed reinforced concrete with a thick asphalt overlay.

Two TRL teams working round the clock cored approximately 38 holes to help determine the extent of the problem.

The 503 Highways Agency has now stabilised the hole with forty tonnes of pea shingle and further geotechnical investigations by TRL confirm that the ground beneath the M2 is safe for traffic to use.

Further resurfacing work has finished, with all lanes now re-opened, nine days after the 15ft deep hole swallowed up the road surface.

For more information on companies in this article

Related Content

  • Highways Agency plans to increase capacity of M4
    March 19, 2014
    The UK Highways Agency is holding a series of public exhibitions to inform road users, local residents and businesses about proposals to transform the M4 into one of the longest stretches of ‘smart motorway’ in England by 2021. The improvement, on a 32-mile stretch between junction 3 at Hayes in London, and junction 12 at Theale in Berkshire, would increase capacity, improve journey reliability and maintain safety. The proposals are part of the Government’s investment into England’s motorways and majo
  • Aurecon-Jacobs JV secures Melbourne metro contract
    July 3, 2015
    Melbourne Metro Rail Authority (MMRA) has appointed the Aurecon Jacobs Mott MacDonald (AJM) joint venture as the technical, planning and engagement advisor for the Melbourne Metro Rail Project in Victoria, Australia. The Melbourne Metro Rail Project unlocks critically needed capacity in Melbourne’s rail network and begins transforming the network into an international metro-style rail system. It includes two nine-kilometre rail tunnels from South Kensington to South Yarra as part of a new Sunbury to Cra
  • TRL launches VR blind spot detector
    October 6, 2017
    UK-based research establishment TRL has launched a blind spot simulator rig which uses virtual reality to improve truck cab design, road layouts and improve the safety of road users and reduce costs for designers. The precision of the system is based on a physical rig developed by TRL and Volvo. It ensures an accurate representation of direct vision from a real-life Volvo vehicle cab which allows seat, steering and wheel adjustments to be replicated for each driver.
  • Aimsun assesses Spain V2X impact
    June 21, 2022
    An Aimsun project with C-Roads Spain to assess the impact of Day 1 V2X services has been completed: Aimsun senior transportation modeller Laura Torres explains some of the results