Skip to main content

TRL aids Highways Agency with M2 motorway hole investigation

The UK’s transport research Laboratory (TRL) provided a rapid response when asked for help as part of the investigation of the recent appearance of a hole in the central reservation of the M2 between junctions 5 near Sittingbourne and 6, near Faversham. The hole that appeared is believed to be a dene hole; an historic man made hole which may have been used to mine for chalk hundreds of years ago. The hole was filled in when the M2 was constructed, but recent wet weather contributed to the destabilisati
February 21, 2014 Read time: 2 mins
The UK’s transport research Laboratory (491 TRL) provided a rapid response when asked for help as part of the investigation of the recent appearance of a hole in the central reservation of the M2 between junctions 5 near Sittingbourne and 6, near Faversham.  

The hole that appeared is believed to be a dene hole; an historic man made hole which may have been used to mine for chalk hundreds of years ago. The hole was filled in when the M2 was constructed, but recent wet weather contributed to the destabilisation of the ground, causing the hole to appear.

Within a few hours of being asked for assistance, TRL was able to mobilise a team to be on site to provide two coring rigs and staff to undertake investigations of the carriageway in one lane either side of the hole to establish its integrity. The carriageway is constructed of jointed reinforced concrete with a thick asphalt overlay.

Two TRL teams working round the clock cored approximately 38 holes to help determine the extent of the problem.

The 503 Highways Agency has now stabilised the hole with forty tonnes of pea shingle and further geotechnical investigations by TRL confirm that the ground beneath the M2 is safe for traffic to use.

Further resurfacing work has finished, with all lanes now re-opened, nine days after the 15ft deep hole swallowed up the road surface.

For more information on companies in this article

Related Content

  • MG Squared’s innovative mounts enhance CCTV maintainability
    September 4, 2020
    When an innovative solution to maintain cameras while minimising lane closures and bucket trucks on the new Tappan Zee Bridge, (formally known as the Governor Mario M. Cuomo Bridge) was needed, MG Squared answered the call. Over 60 custom designed camera lowering devices are in operation on this remarkable structure, spanning the Hudson between Tarrytown and Nyack New York, just north of New York city. This project highlights, once again, how the team at MG Squared can improve surveillance camera maintainability while boosting camera efficiency and overall safety.
  • Gearing up for IntelliDrive cooperative traffic management
    February 1, 2012
    Beginning in the first quarter of 2010 it became evident that the IntelliDrivesm programme direction had been reestablished, by the USDOT's ITS Joint Program Office (JPO), after being adrift for a few years. The programme was now moving toward a deployment future and with a much broader stakeholder involvement than it had exhibited previously. By today not only is it evident that the programme was reestablished with a renewed emphasis on deployment, it is also apparent that it is moving along at a faster pa
  • UK to tackle US$1.6 billion cost of motorway closures
    April 25, 2012
    A UK government strategy to tackle congestion caused by motorway closures and drive down the £1 billion (US$1.6 billion) annual cost to the economy has been unveiled by Roads Minister Mike Penning, who also announced the launch of a £3 million ($4.87 million) fund for police forces to purchase laser scanning technology to speed up of the investigation process and incident clear up times.
  • Truvelo TRIMMS night-time speeds on unlit roads
    June 5, 2014
    Truvelo UK’s new TRIMMS infrared illumination enables mobile speed enforcement in the dead of night. Lincolnshire is the UK’s fourth-largest county, has a population of over a million and is predominantly rural. Only 66km of its 8,893km road network is dual carriageway and 79% of the rest is ‘C’ class or unclassified roads. In terms of Killed and Seriously Injured (KSI) figures, there were 415 casualties in 2013 (down from 526 in 2002). Official figures show inappropriate speed accounts for 25% of the UK’s