Skip to main content

TRL aids Highways Agency with M2 motorway hole investigation

The UK’s transport research Laboratory (TRL) provided a rapid response when asked for help as part of the investigation of the recent appearance of a hole in the central reservation of the M2 between junctions 5 near Sittingbourne and 6, near Faversham. The hole that appeared is believed to be a dene hole; an historic man made hole which may have been used to mine for chalk hundreds of years ago. The hole was filled in when the M2 was constructed, but recent wet weather contributed to the destabilisati
February 21, 2014 Read time: 2 mins
The UK’s transport research Laboratory (491 TRL) provided a rapid response when asked for help as part of the investigation of the recent appearance of a hole in the central reservation of the M2 between junctions 5 near Sittingbourne and 6, near Faversham.  

The hole that appeared is believed to be a dene hole; an historic man made hole which may have been used to mine for chalk hundreds of years ago. The hole was filled in when the M2 was constructed, but recent wet weather contributed to the destabilisation of the ground, causing the hole to appear.

Within a few hours of being asked for assistance, TRL was able to mobilise a team to be on site to provide two coring rigs and staff to undertake investigations of the carriageway in one lane either side of the hole to establish its integrity. The carriageway is constructed of jointed reinforced concrete with a thick asphalt overlay.

Two TRL teams working round the clock cored approximately 38 holes to help determine the extent of the problem.

The 503 Highways Agency has now stabilised the hole with forty tonnes of pea shingle and further geotechnical investigations by TRL confirm that the ground beneath the M2 is safe for traffic to use.

Further resurfacing work has finished, with all lanes now re-opened, nine days after the 15ft deep hole swallowed up the road surface.

For more information on companies in this article

Related Content

  • Counting the environmental costs of ITS deployment
    October 29, 2015
    David Crawford looks at the latest thinking about calculating the benefits associated with the environmental side of ITS schemes. The penny is dropping that some environmental costs “are being shifted outside the traditional bounds of evaluation methods” for ITS-based road transport projects, according to researchers at the UK University of Leeds’ Institute for Transport Studies.
  • Connected vehicles - potential to transform US transportation
    April 12, 2013
    There’s a new face in the driving seat at the US Department of Transport’s ITS Joint Program Office. Fortunately, as Robin Meczes finds out, he’s no learner driver… Ask Kenneth Leonard why he wanted his new job as director of the ITS Joint Program Office, and his answer comes back without a second’s delay. “The potential to save lives, reduce injuries and help people enjoy a more efficient transportation system is the kind of challenge that makes me want to come to work each morning,” he says. “In my opinio
  • Reflecting on five years of important ITS progress
    January 7, 2013
    Former head of the ITS Joint Program Office Shelley Row has passed the baton to a new director. Now working as an independent consultant, here she reflects on her five years at the helm of the JPO and what the future may hold for ITS in the US. During a mid-morning in Paris earlier this year, having just landed, I decided to take a trip on the city’s subway (Paris’ underground metro) into the city centre. A family with a small boy – about nine years old – boarded the same train. They were American and we st
  • Highways Agency launches A14 consultation
    April 9, 2014
    As a result of the public consultation to consider route options for the A14 Cambridge to Huntingdon improvement scheme, the proposed scheme has been developed in more detail and plans to toll the road have been dropped. Changes that have been made in response to feedback from last year’s consultation include improvements to four junctions on the route and an updated local access road been proposed between two villages. The Highways Agency has now launched a ten-week consultation period, which forms par