Skip to main content

Tritium supplies EV chargers to Drive Energi

Tritium has signed a deal with Box Energi to be the sole supplier for Drive Energi, a nationwide electric vehicle (EV) charging network in the UK. Drive Energi is expected to consist of 2,500 charging locations by 2025, with at least 100 sites live by the end of January 2020. The network will be a mix of public and private charging solutions. Kevin Pugh, Tritium’s business development manager for UK and Ireland, says: “With the average daily commute in the UK in the vicinity of 20 miles, a single 20
July 31, 2019 Read time: 2 mins
7335 Tritium has signed a deal with Box Energi to be the sole supplier for Drive Energi, a nationwide electric vehicle (EV) charging network in the UK.


Drive Energi is expected to consist of 2,500 charging locations by 2025, with at least 100 sites live by the end of January 2020. The network will be a mix of public and private charging solutions.

Kevin Pugh, Tritium’s business development manager for UK and Ireland, says: “With the average daily commute in the UK in the vicinity of 20 miles, a single 20-minute charge will add about three days of range to an EV.”

“The sheer scope of the proposed Drive Energi network means that people will easily be able to find a charger, no matter where they are and no matter when they need it,” he adds.

As part of the deal, Tritium will supply 24/7 support for the network, including on-site support. Each charger features a modem which is constantly transmitting data to Tritium’s team of support engineers, who can be contacted by phone.

Related Content

  • August 20, 2019
    Hikvision’s wind/solar solution offers ‘off grid’ vision
    Getting vision tech to ‘off-grid’ areas is a challenge - but Hikvision has come up with an answer in China, while also handling some rather more conventional smart cities work in Germany
  • November 21, 2012
    Transportation hub the centre of sustainable urban development
    A marriage of transit, technology and culture is taking shape in Minneapolis, with ITS systems vital to hopes for a sustainable development centred on a hub of public transportation. Construction started in July this year on ‘The Interchange’ – a station in the Midwest US city of Minneapolis claimed as the most spectacular expression yet of the fast-spreading North American concept of transit-oriented development (TOD). Due for completion in 2014, the Interchange is designed as a multi-modal public transpor
  • February 18, 2014
    Caltrans develops remote remedy for ailing VMS
    A remote diagnostic system for variable message signs keeps Caltrans staff safer and makes them more efficient. District 12 of the California Department of Transportation (Caltrans) maintains roads in Orange County including 292 route miles of freeway lanes and 240 directional miles of full-time high occupancy vehicle or carpool lanes. All of these lanes are controlled from the district’s transportation management centre (TMC) using a network of 58 variable message signs (VMS) positioned alongside or abo
  • January 9, 2018
    Authorities switch on to all electric buses as costs tumble
    Alan Dron looks at changes in bus propulsion as cities look to improve air quality and seek to reduce maintenance costs. Despite the ending of various incentives to adopt alternative fuels, the introduction of electric buses by US transit authorities is picking up speed as performance improves, costs drop and air quality considerations become increasingly significant. More US bus manufacturers are introducing zero-emission models and some recent contracts will see many more passengers getting their first